In Excel 97, open a new work sheet... press F5 i think, and type X97:L97. then hit tab so the entire row is selected, but the second cell is highlighted. then hold the shift key and click the chart wizard icon in the toolbar. If you have directx, you get the flight simulator. If not, you get a bunch of dots flying around the screen with the names of coders etc.
At the voting booth, in the next election.
In Excel 97, open a new work sheet... press F5 i think, and type X97:L97. then hit tab so the entire row is selected, but the second cell is highlighted. then hold the shift key and click the chart wizard icon in the toolbar. If you have directx, you get the flight simulator. If not, you get a bunch of dots flying around the screen with the names of coders etc.
You call the $70,000,000 it cost to make "no budget"?