I also ordered DSL from a company that needs Verizon to complete part of the connection. In June, I was advised that everything would be completed with in 30 to 45 days. At the end of August I was advised that the line was supposed to be installed on September 11th, but that Verizon typically took 10 business days to notify my DSL company when an actual DSL line was completed.
Needless to say, it does not look like Verizon has done anything since the junction boxes do not appear to have been opened in months.
I also ordered DSL from a company that needs Verizon to complete part of the connection. In June, I was advised that everything would be completed with in 30 to 45 days. At the end of August I was advised that the line was supposed to be installed on September 11th, but that Verizon typically took 10 business days to notify my DSL company when an actual DSL line was completed.
Needless to say, it does not look like Verizon has done anything since the junction boxes do not appear to have been opened in months.