You would think that network redunacy would be a something the net engineers would try to get done each year...I can only speak from my experience as a rural school telecom director...we are doing a complete campus rebuild and in the overall scheme the cost to add complete redunancy was maby 4% of the overall cost...that is not much...I think it was both the engineers and the administrators fault...engineers sould have pushed harder and the administraors should have got there head out of the collective asses!!!
bg
But I shoot bottle rockets out of it instead...
You would think that network redunacy would be a something the net engineers would try to get done each year...I can only speak from my experience as a rural school telecom director...we are doing a complete campus rebuild and in the overall scheme the cost to add complete redunancy was maby 4% of the overall cost...that is not much...I think it was both the engineers and the administrators fault...engineers sould have pushed harder and the administraors should have got there head out of the collective asses!!! bg
To put it simply Yoda is a "Bad Ass". We now know why everyone was in awe of the little green thing with hair coming out it's ears.