Slashdot Mirror


Network Testbed Emulab.net

gseidman writes: "Have you ever needed to simulate a network? Tired of old ns? Do you just hate dealing with hardware in general? Take a peek at Utah's Emulab.Net. They have over 300 PCs, some StrongARM devices, roughly 5 miles of cabling, a huge and expensive switch, and great software for setting up a virtual LAN. They also have a gallery showing the machine room in various stages of completion (did I mention five miles of cabling?)."

6 of 120 comments (clear)

  1. This is very cool. by perdida · · Score: 3, Informative

    This is applied research, the type that may have direct and positive effects on improving security and efficiency in the immediate future.

    Unlike dark matter research, Mars colonization, and subatomic research, this stuff is the kind of thing that should attract wide funding from business. Immediate payoffs are likely.

    Basic research is fine, but I wish that the money poured into it would go towards immediate business applications. More available cash would make those venture capitalists a lot nicer and less demanding of unrealistic profits in an unrealistic period of time.

  2. 5 Miles of sloppy cabling... by GLX · · Score: 5, Informative

    I don't know what brainchild designed the layout of those switches, but the fact that they went for the RJ-48 blades versus the Telco (RJ21X) blades in those switches shows sloppy planning. What if one of the blades in the middle goes out? They have to unplug 48 Cat-5 cables versus unscrewing 4 telco harmonicas and leaving the 48 ports untouched on a patch panel

    If you're going to put forth that kind of effort and money, why not do it right the first time?

    --
    Sig (appended to the end of comments you post, 120 chars)
  3. Agreed by clark625 · · Score: 3, Informative

    I totally agree with you. Simulation doesn't prove that things will be all peachy cream later on in the "real world".

    Then again, if a 1/100th scale model does a nose dive in the wind tunnel when they throw a little turbulence at it, you can bet the ranch that plane will be redesigned. Testing and modeling only show the existence or non-existence of very particular problems. We just usually hope that we can "test" out as many likely problems as possible.

    --
    Long, cute, or funny Sigs are just another form of over compensation, used by geeks, nerdz, etc.
  4. Re:5 miles, big deal. by mac.newbold · · Score: 5, Informative

    I was one of the few 'lucky' people who had to run it, and no, we didn't run it thorough a 2ft high crawl space. It is even worse than that.

    In case you couldn't tell from the pics, this is all in self contained racks. The large majority of the wiring is in 9 standard-sized racks, or about 7ft tall * 3ft deep * 2 ft wide * 9 racks = 378 cubic feet for about 5 miles (25,000 ft) of cable plus all the PCs and switches.
    As a generous estimate, that leaves 100 cubic feet for cables and ventilation. That says the every cubic foot of open space is filled with an average of 250 linear feet.

    Needless to say, it was not fun.

    Mac

    --
    Does the name Pavlov ring a bell?
  5. Only 5 miles? by yzquxnet · · Score: 3, Informative

    The post submitter makes 5 miles of cable seem like a lot. Well, it isn't. Even a small office complex can burn through 50,000 ft a cabling in short work. Running two data cables effectivly doubles your cable requirements. Depending on the situation the installer may even lay a third cable for voice. (What standard was that?) Anayways, 5 miles of cable is not a lot.

  6. Re:Notice the hardware config?!? by A+Commentor · · Score: 3, Informative

    Wrong... that was the 75GXPs. See the original article.

    I double checked a few posts, and they mentioned that the 60GXP was much more reliable.

    --

    Looking for any old 8-bit Heathkit/Zenith software/hardware - http://heathkit.garlanger.com