Boston's Big Dig Delayed Because of Programmers?
dalewj writes "This article in the
Boston Globe explains that Boston's Big Dig will be ready to open on time, if the software developers and cable layers can get their act together." Turns out honeywell's software isn't quite ready.
It's ironic that the work crews are on time and the geeks aren't. :)
And no, it's not behind schedule. The original plans were for 1994, but those got scrapped as the project got bigger and they realized exactly how long it would take. So based on the revised finalized schedule that was released about 1 year into the project, it's still on time. Sure, not on time based on the initial predictions which were way too optomistic, these deadlines are based on reality.
The Big Dig is a massive highway tunneling and reconstruction project to solve some of the serious gridlock problems Boston has. Since Boston competes with New York for convention attendance, this is relevant to many business travelers. (And MacWorld was once held there, and my be held there again.)
I know this, and I'm not even from there! You see the Dig mentioned regularly on other news sites from time to time; been going on for years now.
Those who complain about affect & effect on
Because of the Federal Aid Highway Act (FAHA) of 1956. Impressed by the autobahn's usefulness during WWII, Eisenhower wanted the same thing to be available in the U.S. in case the damned Russians ever invaded and we needed to move a lot of troops quickly. All major cities and their airports were supposed to be accessible, and the Big Dig was funded because it connects I-90 to Logan airport. The tunnels are also able to withstand heavy conventional bombing. Pretty damned cool.
The Boston mass transit system (MBTA) has the oldest subway lines in the country and is more or less useless as a result. It's $1.00 for subway fare, unless you're taking the green line in from the metro-west suburbs, where it can be more. The bus system and the commuter rails are expensive as hell if you take it more than 15 miles or so and you're using it for work every day. As far as the auto traffic goes, I've sat in traffic for more than an hour at 11 p.m. at night coming into from north of the city on I-93. Every day, all day, you're guaranteed to hit a ton of traffic anywhere inside the I-495 belt if you're on a major road.
Actually, the tolls are going up on other highways. The Big Dig is mostly I-93, which will remain free. The tolls have already gone up on I-90, and are projected to go up again later. The only part of the Big Dig that will have tolls is the new tunnel to the airport. I expect they could do the accounting to say that that tunnel is the part that the state paid for.
Though I would much prefer higher gas tax an no tolls whatsoever. The Mass Pike is a huge patronage system that exists primarily for the sake of providing perks for the powerful and connected. (Note, for example, that they didn't reduce the number of tolltakers when over half of the cars now use automatic EZ-Pass style transponders.)
The problem is not the programmers. Its the **** software we were given to work with.
The problem starts with the fact that we are the second contractor to pickup this problem, and we are required to adapt the first contractor's software to our needs. The software we have been given to work with is shoddy, badly coded, and still targets VAX C (even though it runs on an Alpha). Problems tend to crop up, and no one here really understands the system, including our contractors from the original system.
We also have all sorts of problems hiring (due to problems both on our side and their side of the table). We are never given enough money or time, and everyone here is vastly overworked.
The CA/T (Central Artery/Tunnel, or the BigDig) doesn't understand our needs or concerns, and getting help from them and their reps is like pulling teeth. Its like going to a frickin' Wrestling match, with petty arguments and name calling and bullshit all around.
Their requirements are frequently illogical and unclear, meaning time has to be spent on fixing the requirments that could better be spend on coding. We have all sorts of reliablity problems with the Alphas and assoicated hardware. It also takes about a pound of paper work and 3 days to be able to do anythign to the production systems in Boston.
The project is just one political mess, and to be honset, we are the CA/T's bitch, and get blamed for anything. The truth is that ev eryone is behind schedule, and that even if we are late deliviering, it will not matter because the tunnel will not be physically completed anyway. Kinda hard for the software to work if there's nothing out there for it to work with.
Ok, enough ranting for now. Feel free to reply or e-mail questions.
U.S. Senator who ensured the passage of the Surface Transportation and Uniform Relocation Assistance Act of 1987. This act included the federal funding for the Big Dig. President Ronald Reagan had vetoed this bill earlier that year. The senate voted to sustain this veto. Senator Kennedy allied with West Virginian Senator Robert Byrd to force a revote in the senate to override Reagan's veto. The revote was approved. At that point Kennedy and others put pressure on the deciding vote, namely, Senator Terry Sanford of N. Carolina. They threatened to pull tobacco subsidies to North Carolinian farmers. Under this pressure, Sen. Terry Sanford changed his vote and the Big Dig bill became law in April of 1987.
"God fights on the side with the best artillery." - Napoleon, Marshal of France - speaking truth to power
I'm a programmer on the project also, he got everything exactly right.
"Let me open these blinds so the snipers can see in." - Kevin Giffhorn
The original plan was for several roads around it; someone mentioned 128, but there was also I-695 that was supposed to just skirt downtown. It was never built because it would have utterly destroyed a number of poor but vital neighborhoods, and because the inhabitants of those neighborhoods no longer trusted the Mass Highway Dept to take care of their interests (i.e. relocation, etc); there had been an awful lot of bad faith building the Mass Pike and the (old, elevated) Central Artery. Check out www.bostonroads.com for the gory details.
/Brian
Boston's highway system (with the exception of the Pike, which has its own connected but separate history) was designed around I-95 and the Inner Belt, but two major segments of I-95 (Canton to the South End and Revere to Peabody) were never built (the segment that was built is now I-93 downtown and Route 1 north of Boston), and the entire system is a half-baked mess because the core of the system was never finished. Depressing the Central Artery is supposed to alleviate at least some of the resulting mess by increasing the downtown capacity to handle the traffic that the Inner Belt was supposed to deal with.
(And no, they can't build the Inner Belt now -- the northern ramps (built, but cut off -- a news crew once put up a prank sign saying "Out of town drivers exit here) now lead to Storrow Drive, one of the major roads that runs along the Charles River, and the southern ramps were demolished and replaced with a commercial-vehicles-only connection to the airport.)
There are 4 lines on the Subway system, and all are based upon getting people downtown. The subways head downtown and out. Within each of the 4 colored lines (5 if you count the new Silver Line, which is a fancy bus at this point, but will be a legit extension to the Subway system in 10 years when completed) there are some splits, where they go to different, yet similar locations.
This was useful when all employment/shopping was downtown, but presents some problems as the economy spread from downtown Boston. If you are going anywhere that requires switching trains, you will be spending a minimum of 30-45 minutes on your trip. Busses can help with this, as they cut between different lines, but until a few months ago the route numbers weren't posted and the website remains difficult to use. While commuters can figure out the busses to simplify their commute, it simply isn't practical for an individual trip.
Beyond that, the system gets really slow. I live out on the Green Line, which is the most residential of the trains. After Kenmore Square, they become "Trolley lines" that are above ground, but have a dedicated area for their tracks. This means that the trains can't pass one another if one gets bogged down, and there is no meaningful way to run express trains.
The road system is a collection of disasters because of Boston's heritage. Boston is unable to rework their roads without shutting down the city, and an execessive number of buildings are declared historical, stopping progress.
On top of that, the elevated central artery, which the big dig will replace, cuts through Boston. Now ask yourself who would want to live right near a highway (and walk underneath it), and you realize why the Central Artery trashed the neighborhoods. Walking under a highway is a strange thing, and it cuts neighborhoods apart. This results in social costs in excess of the traffic.
Part of the problem with the subway system is that it is too slow. Even in Rush Hour, it is faster to drive then take the subways. If the trains go above ground (the Green Line), they are stuck waitting for lights like cars, and they have a 30 MPH limit (same as the official speed limit) plus they need to stop.
An additional problem is the system only runs trains once every 10 minutes (most busses are every 30 minutes). This makes the subway painful for short trips. If you are only going a few stops, you might spend 15 minutes waitting for the train for a 5 minute trip.
Boston has transportation nightmares. Unlike New York, that does construction at night, all road construction is done during the day in Boston, including during Rush Hour. The unionized workers don't have to put in overtime, so sometimes jobs will involve ripping up a street on Thursday/Friday, then MAYBE getting to fix it Monday or Tuesday of the next week. However, if it wasn't planned that way, it may be a week or more before they return with equipment.
The Big Dig will help with the highway crunch, but won't solve the general problems in Boston. The only nice thing will be if the Big Dig does enough, then people will take Highways (they'd be faster than city streets for a change) which might alleviate some of the other traffic. More likely, driving to work in Boston will be more pleasant, so people will get more cars bringing us back to the status quo.
Well, at least the friends of the powerful were able to buy all the slumlands next to the highway that is about to become parkland. They're going to make a fortune on those luxury apartment complexes that used to be crack houses or slums.
Alex