ecklesweb asks: "Do software defects found in later phases of the software development cycle REALLY cost THAT much more than defects found in earlier phases? Does anyone have any empirical data (not anecdotal) to suggest that this logarithmically increasing cost idea is really true? That is the question I use whenever I want to tick off a trainer. Seriously, though, it seems an important question given the way this 'concept' (or is it a myth?) drives the software development process."

"If you're a software engineer, one of the concepts you've probably had driven into your head by the corporate trainers is that software defects cost logarithmically more to fix the later they are found in the software development life cycle (SDLC).

For example, if a defect is found in the requirements phase, it may cost $1 to fix. It is proffered that the same defect will cost $10 if found in design, $100 during coding, $1000 during testing.

All of this, to my knowledge, started by Barry Boehm in papers[1]. In these papers, Mr. Boehm indicates that defects found 'in the field' cost 50-200 times as much to correct as those corrected earlier.

That was 15 years ago, and as recently as 2001 Barry Boehm indicates that, at least for small non-critical systems, the ratio is more like 5:1 than 100:1[2].

[1] - Boehm, Barry W. and Philip N. Papaccio. 'Understanding and Controlling Software Costs,' IEEE Transactions on Software Engineering, v. 14, no. 10, October 1988, pp. 1462-1477

[2] - (Beohm, Barry and Victor R. Basili. 'Software Defect Reduction Top 10 List,' Computer, v. 34, no. 1, January 2001, pp 135-137.)"

2 of 125 comments (clear)

  1. Costs accumulate by David+Byers · · Score: 5, Insightful

    Never forget that complexity accumulates. Fixing the bug itself probably costs about the same at every stage, but other costs are introduced as the project moves along, and peak after the software has been deployed.

    A bug found after deployment has costs associated with it that a bug found during coding does not:

    • Cost of running integration and system tests again.
    • Cost of recertification (if you're in that kind of environment).
    • Cost of deploying the software again.
    • Support costs when only half your customers deploy the new version.
    • Indirect costs caused by using resources to fix bugs rather than implement revenue-generating features.
    • Liability for damages caused by the bug.

    The cost of finding and fixing the bug may be negligible compared to other costs.

    Another aspect of the issue is the nature of the bugs you find late. In my experience, bugs that survive testing and deployment tend to be either bugs in requirements or pretty subtle bugs that slipped through testing, and both are more expensive than the type of bugs commonly detected early on during development.

  2. POP3 as an example. by Technician · · Score: 5, Insightful

    If POP3 could have looked forward and seen the SPAM and Forged header abuses, security could have been part of the standard. Now that POP3 and IMAP mail is everywhere and forged headers are also everywhere, changing the de-facto standards is a big thing. Making the switch to something more robust will be a long and painful transition. Everything will be incompatible for a while.

    It will be as easy as getting the US to switch to the metric system or transition with the rest of the world to driving on the left side of the road. Both would be much cheaper if they were implimented in the beginning instead of attempting a transition later.

    --
    The truth shall set you free!