Virginia MagLev Project Back on Track
Raven42rac writes "After much delay, the $14 million Maglev train project is back on track at Old Dominion University in Virginia. All the petty lawsuits have been settled, and a much needed $2 million grant has been approved. Let us hope that this sets a precedent to Americans to not litigate ourselves out of the science and technology markets due to petty disagreements and greed. We do not need to be our own worst enemy. I, for one, would much rather ride a Maglev monorail with others, than drive a gas-guzzling car by myself. (And I apologise for the pun in the headline.)"
First, I wouldn't say it is in a rural area. There is a large population in our region. We suffer from sprawl pretty badly, but the figures say we have more technology jobs in Southeastern Virginia than in the state's capital region, Richmond. Norfolk is next to Virginia Beach (400k), Portsmouth, Suffolk, Hampton, Newport News, Chesapeake and others. At least 1.5mil, if not more.
FROM WHAT I UNDERSTAND, the maglev system worked when it was in Flordia on the test track, because the rails were on the ground. There are videos on the American Maglev site of it moving before the ODU system was put together. Once the ODU setup was constructed, they hit a snag. The rail flexes from the weight, and the system tries to adjust for it by adjusting power to magnets, which causes the rail to react, which starts an oscillation loop or something. Ooops.
The system here is opposite from the German Transrapid system (which is totally bad ass, btw). The guideway in the German system is more intelligent / has electromagnets / something, where as the one at ODU most of the guts are in the actual cars. This means the guideway is much cheaper to deploy. If you have ever seen it, the guideway is pretty frigging narrow, it would be easier to handle right of ways for such a thing.
It is a shame the contractors haven't been paid, and it is a shame it hasn't gotten further. From what I understand they are finally getting their hands on the money. It would be interesting to see a cost break down.
If you think about it, 14 million in what could be a better transportation solution for cities is chump change. Companies spend $3 million on blanket Windows software licenses. The theory is if/when it works it could spawn a new industry and our region could gain new businesses that support it.
People complain about the money going to the monorail, yet they don't complain about their tax money going to schools where many of the students are from out of country and leave when they are done with their education. Granted there are private interests working here, but I fail to understand the hatred for the creation of something new and something better.
Lastly, they are started to talk about this stupid light rail stuff here, that is little trollys that run on conventional rails. Lame, gradings obstruct traffic, they are slow. Elevated maglev is the answer! HOORAY!
Southeastern Virginia REPRESENT!