HP Kills Off Utility Data Center
pacopico writes "HP's much hyped and highly-regarded UDC system has gone the way of the dodo. The Register charts the technology's demise and points to the few other reporters who covered UDC's end. Spent some time at HP checking out UDC and am sad to see it go. Ahead of its time to be sure."
First post
Go make me a sandwhich, bitch.
Donald Duck is very upset. He knows that he could have used the UDC to spy on Cmdr Taco so he could have a SCREAMING ORGASM fr1st ps0t!!! woot1 hot hot hot!
Listen in on Donald Duck!
Imp0rtànt Stûff
# Pléàsé try t0 kéép p0sts 0n t0pic.
# Try t0 réply t0 0thér pé0plé's c0mménts instéàd 0f stàrting néw thréàds.
# Réàd 0thér pé0plé's méssàgés béf0ré p0sting y0ûr 0wn t0 àv0id simply dûplicàting whàt hàs àlréàdy béén sàid.
Mod this one redundant. It got submitted before all the links were in place. A better version of this post with all working links is here
DEC what now?
96 quite bitter beings like to stack the bodies high!
Okay, the topic goes on slowly and the question has 99.9% chance of not passing as "ask slashdot" story anyway.
Okay, what decent Free (F, not f) MP3 player would you suggest for use with WinNT4.0 (at work)? Or should I just forget it and go with Winamp?
Anagram("United States of America") == "Dine out, taste a Mac, fries"
Visit http://www.beheadingvideos.co.za/
n/t.
Most people are familiar with the current Dallas and Houston Tollway Systems. To illustrate one problem with the Austin Plan, compare Toll Road Miles per million people: Houston has 17, the city of Dallas has 13, and Austin will have more than 113! If you look at the Dallas and Houston maps, you'll notice those cities, (as other cities with toll roads throughout the United States) have a simple loop or E/W and N/S tollways as additional "new" road options. The toll plans we all know in the past are built with investor dollars, and they complement the existing highways. The toll plans we all know in the past are built with investor dollars, are new roads, took years to carefully plan and they complement the existing highways. The Austin toll plan is built with our tax dollars and the toll roads become our existing highways. The Austin plan was rushed and approved within 3 months. If this doesn't look like a boondoggle, what does?
The Austin Toll Plan - Download Larger Map:
Shifts allmost every local Highway to Toll Roads.
Uses Billions of our tax dollars to finance the Toll Roads. In the past Toll Roads were built with 80% bonds...these toll roads are built with 80% of our tax dollars.
Seizes over $100 Million of our tax financed roads/projects in Austin and converts them to Toll Roads. See .pdf
It's not a transportation solution, it's a "Revenue Generator", a Boondoggle for special interests.
TxDOT's plan to FORCE us on to Toll Roads (see page 10 of TxDOT internal presentation)
Information Highway: "People should be concerned if they are concerned about the privacy of their location" - Lee Tien, an attorney at the Electronic Frontier Foundation
Rick Perry, Special Interests and The Austin Toll Plan
Where is the Money?