Continued Success for Space Elevator Tests
Jacki O writes "According to their Web site the Space Elevator company Lifport recently managed to get their platform and climbing robot to the mile-high mark over the Arizona desert." From the announcement: "A revolutionary way to send cargo into space, the LiftPort Space Elevator will consist of a carbon nanotube composite ribbon eventually stretching some 62,000 miles from earth to space. The LiftPort Space Elevator will be anchored to an offshore sea platform near the equator in the Pacific Ocean, and to a small man-made counterweight in space. Mechanical lifters are expected to move up and down the ribbon, carrying such items as people, satellites and solar power systems into space."
A little progress is better than no progress.
-IOVAR Web Dev Platform
Far from it. All of the components of a space elevator will be revolutionary, not just the ribbon. The climber's mechanical parts have to work flawlessly for about 100,000 km. The actual problem of gripping a cable isn't trivial, either. And it needs to be very low weight. Oh, and very low power. And just to make things even more fun, it'll need to work in vacuum as well.
If you read some of the papers on concerns for the climber at the space elevator conference, you realize that there's nothing easy about this. It's unsurprising that the climber is seeing the most progress first, but that first concern (perfect reliability over 100,000 km) will take a long time, so better to start now.
The challenges of a space elevator aren't in the climber; they're in the cable.
... well, large, but not unreasonably large. It would just cost a lot more.
C'mon. That's not true. The main reason it seems like this is because you think you know how to build the climber, but you have no idea how to build the cable. Ask a materials scientist who's working on carbon nanotubes, and they might disagree with you.
Plus, you do not need a 100 GPa cable. You need a 100 GPa cable for a small taper. At 50 GPa the taper becomes
There are a lot of issues with the climber design. A lot. Speed, reliability, weight, and power. Reliability in particular will take a lot of time to nail down. It makes sense to tackle that one first, because it can be done in parallel with the cable design, and in addition, the third major challenge (power delivery) can't really be done until the climber design is finalized.
So you've got three difficult tasks - the cable, the climber, and the power delivery system. The last two are coupled. What makes sense is having two separate tasks, one of which handles the cable, the other the climber, and then the power delivery system. Oh look! That's exactly what they're doing.
Given our lack of experience in building cheap vehicles that can travel 100,000 km with zero failures (with low power, in vacuum) I think it's safe to say that all parts of the elevator are difficult.