Alternative Launcher For Returning To the Moon
DIRECT Launcher writes, "A grass-roots effort, based around a group of engineers, managers, and others involved in the US space program, is proposing an alternative launch vehicle for NASA to adopt for the new Lunar Exploration program. The new vehicle offers serious performance and cost savings totaling $35 billion over the next twenty years. The proposal was presented to NASA last week. The concept would make possible future Hubble Space Telescope servicing missions after Shuttle has retired, allow for all the remaining ISS elements to be launched after all, free up cash to fund the JIMO mission again, and also allow NASA to return to the moon three years early."
The shuttle has an absolute lift power of ~120 metric tonnes. The fact that the majority of the lift power is used in lifting the Space Shuttle itself brings the maximum cargo lift weight down to ~25 metric tonnes.
Why wouldn't the 130 metric tonne to LEO Ares V do the same? With the DIRECT, you could finish the Space Station. (A useless piece of junk in the wrong orbit.) With the Ares V, you could launch a new one in only two flights.
All these technologies are "shuttle derived". Which means that the Super Booster capabilities of the Shuttle are separated from the Space Shuttle vehicle, and placed into a more traditional stack. Through the use of more engines and staging, NASA plans to launch more absolute weight with the Ares V than the Shuttle can launch today. The DIRECT would actually scale back the absolute weight.
The Ares has an upgrade path (read: even more tonnage per launch) through the development of better engines. The DIRECT design anticipates those engines, and demands that they be manrated before they are ready. Which should raise a lot of red flags.
Basically, the DIRECT design stands out as a beautiful paper concept. It all seems to come together into the perfect solution, but ignores the realities of the situation. More likely than not, we'd never get a craft off the ground if we went with the DIRECT design. Warts or not, the CEV is the pragmatic solution. We need to follow the program through to conclusion, and not get distracted by the paper ideas that jump out at us.
Javascript + Nintendo DSi = DSiCade