Mars Rovers Celebrate Their 1000th Sol On Mars
Cherita Chen writes, "Yesterday NASA, Cornell University, and the USGS celebrated the Mars Exploration Rovers' 1000th Sol on the Red Planet. The first rover to land, Spirit, reached the 1000 Sol mark a few weeks ago while the planet was in Solar conjunction. 'Opportunity,' Spirit's twin, and the second lander to make the bounce to Mars, celebrated the milestone yesterday while sitting atop Victoria Crater on the other side of Mars. Both Rovers are still operational (though Spirit is limping) and are sending back valuable data. Not bad for what was slated to be a '90 Sol' mission."
Can we say it is due to the usual x10 engineering safety margin?
90 sol * 10 -> 900. Sort of close to 1000%.
The engineers would have looked at MTBF (mean time between failures) of the components and probably designed for at least a 99% survivability to 90 sol. This might factor down to a 90% survivability to 900 sol depending on the failure curves for the parts. So the the probability of two surviving that long would be 0.9 * 0.9 = 0.81 or 81% chance.
Not bad for what was slated to be a "90 Sol" mission."
The predictions was probably made as some sort of "average", but the odds it'd last exactly 90 days was slim. I'd say the odds of not landing properly at all, or immobilized shortly sfter landing was fairly significant. It's like a computer surviving burn-in or a person surviving infant mortality (though they are much lower in recent year), then they're likely to live significantly well past average. Plus some luck with whirlwinds clearing the solar panels, I guess.
Live today, because you never know what tomorrow brings
I just hope they never have probes on Mars and Venus at the same time because calling both types of day 'sol' will be confusing (though admittedly Venus is a little different). The length of the Martian day is a property of Mars, not of the Sun. It should have a name that reflects it's Martianness.
Doesn't it make you feel good to know that our freedoms are protected by politicans, lawyers and journalists.
> Not bad for what was slated to be a '90 Sol'
They intentionally underestimate the operational duration of the equipment to continually "WOW" the public. "Undercommit, overdeliver."
Something Engineers need to do to when scheduling their projects.
Ed Barbar, President and General Manager, Furnit USA