Bigelow Aerospace Fast-Tracks Manned Spacecraft
Raver32 writes "Following the successful launch and deployment of two inflatable space modules, on Monday the owner and founder of Bigelow Aerospace announced plans to move ahead with the launch of its first human habitable spacecraft, the Sundancer.
The decision to fast-track Sundancer was made in part due to rising launch costs as well as the ability to test some systems on the ground, company CEO Robert Bigelow said in a press statement.
'As anyone associated with the aerospace industry is aware, global launch costs have been rising rapidly over the course of the past few years,' Bigelow is quoted as saying. 'These price hikes have been most acute in Russia due to a number of factors including inflation, previous artificially low launch costs and the falling value of the US dollar.'"
remember, on earth we look at homes by floorplans. In space, things can be utilized more efficiently because your ceiling is your floor is your wall. You can have a bed on the ceiling and free up 'floor' space. It's all relative. There need not be blank walls, unless there is a window with a view.
Ugh, this ends up coming up every time there's a story on Bigelow Aerospace's habitat modules. From the wikipedia article on Bigelow Aerospace: Contrary to many expectations, Bigelow Aerospace anticipates that its inflatable modules will be more durable than rigid modules.[3] This is partially due to the company's use of several layers of vectran, a material twice as strong as kevlar, and also because, in theory, flexible walls should be able to sustain micrometeorite impacts better than rigid walls. Also, from the BA 330 article: Its skin, made of high-strength textiles and Vectran-like materials, is wrapped with several layers of high-tension straps. It is particularly resistant to damage from micrometeorites and debris.
It's been little reported, and they are yet to update their schedule on the web site, but Elon Musk has said SpaceX won't be launching another Falcon I until next year. The two launches planned for the second half of this year have been scrubbed so they can make performance improvements to the vehicle. Most notably, changing the engine from Merlin 1a to Merlin 1c, and upgrading the material on the second stage tank to a higher strength aluminum, along with some improvements to the second stage engine. Robustness issues will also be addressed.
How we know is more important than what we know.