Slashdot Mirror


Computers May Thwart 2010 Census

smooth wombat writes "With the Constitutionally mandated census of 2010 just around the corner, it appears the Commerce Department's attempt to use handheld computers to gather census information may not come to fruition. Originally, the contract was awarded at a cost of $596 million to Harris Corporation. However, the GAO has now estimated the revised contract, now costing $647 million, could grow to $2 billion and the equipment may still not work properly. There is consideration that the paper and pencil method might have to be employed to complete the census."

15 of 287 comments (clear)

  1. Any history buffs out there? by pegr · · Score: 4, Interesting

    Recall that Herman Hollerith came up with punched cards for the 1890 census. He founded the company that became IBM. Here's some linky goodness.

    1. Re:Any history buffs out there? by xav_jones · · Score: 4, Funny

      Yeah punched cards seem to have worked well for Florida ...

  2. 1% error by Red+Jesus · · Score: 4, Insightful

    He also said the computers actually are easy to use, with a failure rate of less than 1 percent when tested in the field.
    One percent of three hundred million is three million.
    1. Re:1% error by eepok · · Score: 5, Insightful

      Ya, people are really bad when it comes to big numbers. I was a part of a research study as an undergraduate with the following premise:

      You're on a jury for a murder case with the scenario that a tan/brown man seen running away from a murder scene on a college campus. There was not enough of the attacker's DNA at the scene, but they were able to extract a DNA derivative that has matched that of a tan man in custody. Given that this derivative has a 99.9% successful rate, do you feel comfortable convicting the man in custody.

      I was the only one in my group of 12 to say "No, I will not convict based on this evidence." No one else understood that .1% = 1/1000. Nor did they realize that our university alone had 20,000+ people on the campus at any time let alone that it was in the middle of a city of 200,000+.

      Most people know what "fifty" is. Many know what "one hundred" is. Few understand what "one thousand" is. Too few understand the effects of millions, billions, and trillions.
      There's no way I'd convict with a .1% error, there's no way I'd accept a 1% error in the business of millions.

  3. Are you serious? by TripMaster+Monkey · · Score: 5, Insightful

    Originally, the contract was awarded at a cost of $596 million to Harris Corporation. However, the GAO has now estimated the revised contract, now costing $647 million, could grow to $2 billion and the equipment may still not work properly.

    1.4 billion is one hell of an overrun...and after all that, the equipment may still not work properly?

    Is the Harris Corporation currently hiring? I'd like to get me some of that boondoggle.

    --
    ____

    ~ |rip/\/\aster /\/\onkey

    1. Re:Are you serious? by Hatta · · Score: 4, Interesting

      Corruption.

      --
      Give me Classic Slashdot or give me death!
  4. Re:Anyone have any idea... by petermgreen · · Score: 5, Insightful

    Government departments often have regulations that require them to put contracts out to tender and give them to the lowest bidder to prevent people handing out government contracts to thier friends.

    The problem is if they put them out for bidding as fixed price contracts they probablly wouldn't get any bids and if they did those bids would be very high. So the bids are only estimates. Of course this makes the bidding a farce as everyone tries to put in the lowest estimate they can and sponge more money later once the governement department is locked in.

    --
    note: i'm known as plugwash most places but i screwd up registering that here somehow in the past and now can't register
  5. Re:Another waste of money by drinkypoo · · Score: 4, Insightful

    BTW, I'm assuming here that a census should be just counting heads; that all of the other questions that the census people ask, such as level of education, are none of their business. The constitution requires that people be counted. The goal was to ensure proportional representation. It does not require all of the intrusive questions that they ask now.

    You are not required to answer any other question on the census, either.

    You can really just say "nine people live here, go away" and they will.

    All that information IS necessary for the government to provide all the services they provide today in a reasonable and efficient manner.

    Unfortunately, it would also require that those in charge be interested in reason or efficiency. All they want to do is separate you from money.

    So, I agree, but only in that the government should get their nose out of places it doesn't belong in a more general sense. Unfortunately, we could probably argue about what those things are all day.

    --
    "You're right," Fisheye says. "I should have set it on 'whip' or 'chop.'"
  6. Is Diebold making the computers? by Tired+and+Emotional · · Score: 4, Funny

    Lets hope not. The population of the West Coast and the North East combined would come out at zero!

    --
    Squirrel!
  7. Foreign census experience by Bombula · · Score: 5, Interesting
    I was living in a Gulf country a few years ago when the government there conducted the census. They just sent out an army of 20-somthings with PDAs to do the surveys. I believe most of the survey was multiple-choice, but there were some numeric entries (how much I earned per month and what y rent cost, for example). You could do those with multiple-choice too, obviously, with a selection of ranges.

    The whole census survey took about 15 minutes. They collected a lot of data - I'd say there were between 60 and 80 questions. Since I'm a geeky sort of person, I asked the kid how it worked and he showed me - the PDA (a Compac Pocket PC) just ran a macro in MS Office which dumped each survey as a file into a folder. That folder synced via wireless/mobile-phone link to where the main data center was.

    The country has a population of about 4 million, and he said there were 200 people doing the survey for several months. Seemed pretty straightforward, and I can't imagine it cost that much - certainly labor and not the PDAs was the primary expense.

    --
    A-Bomb
  8. Major IT failures seem so common by Anonymous Coward · · Score: 5, Interesting

    Bet if you did a study, a serious one, you'd find there's an irrefutable inverse relationship between the amount of money bid for a project and the success of that project. I know it sounds like a flippant witticism, but I'm sure of it, do the research and the figures will prove a direct *causal link* between the amount of money put in and project failure.

    I mean, what is it with these large scale IT projects? They take a simple problem and turn it into a money pit. Here in the UK we've had several high profile massive budget IT failures in the last 10 years, air traffic control, national health patient record databases, in fact the more critical it is the more of a spectacular unqualified fuck-up it becomes.

    Now, if you got a couple of average hacker nerds and gave then the same specs, but didn't tell them it was for a large scale project, or for whom, they would give you a faultless solution using commodity hardware, stock methods and free software in a few months at one *millionth* the cost we're looking at here. Every one of you here knows it to be true. So, my question is, what goes wrong? How can it possibly go so wrong? Are the people involved complete idiots? Or corrupt?

    What are the factors that turn a simple software project into an impossible task? Is it the stress of high budgets? Too many crooks spoiling the broth? And more to the point, when is some bright person going to break from this pattern of failure and realise that to award a major government IT contract to *more than one* complete no-name outsiders bidding a fraction of the cost makes more sense than giving billions of dollars to one contractor and putting all your eggs in one basket?

  9. How to get big numbers across by sconeu · · Score: 4, Informative
    Many people don't understand big numbers... My favorite way to get across just how big ONE BILLION (pinky-to-mouth) is, is as follows:

    A rich man wanted his wife to stop bugging him for money. So he gave her $1Million, and told her to spend $1000 a day.

    Three years later, she came back, and said she was out of money. So he gave her $1Billion.

    She didn't bug him again for 3000 years.
    --
    General Relativity: Space-time tells matter where to go; Matter tells space-time what shape to be.
  10. Canada had census forms online in 2006 by LordEd · · Score: 4, Informative

    Our last census had the option of filling out the census forms online. I didn't find out how many actually did it, but they were originally estimating 20% usage. Instead of getting the full booklet to fill out, you got an access code.

    http://www.cbc.ca/story/canada/national/2006/04/27/online-census060427.html

    While searching for a reference article, i found that there were some issues with Linux users, although they attempted to correct it.

    http://www.linux.com/articles/54366

  11. Re:Anyone have any idea... by shadow349 · · Score: 4, Interesting

    So the bids are only estimates.
    I've done work on construction estimates that were of similar (~$250M) size that were submitted as "GMP" - Guaranteed Max Price. Yeah, Change Orders will pad that somewhat, and there is some contingency, but together they won't be more than 15%.

    Of course this makes the bidding a farce as everyone tries to put in the lowest estimate
    Which is why I've always felt that the process should pick the second lowest bid. It's trivial to shoot for the bottom ... it's impossible to shoot for second from the bottom.
  12. Re:Anyone have any idea... by NewbieProgrammerMan · · Score: 4, Interesting

    Yay for non-technical decision makers making technical decisions!

    My favorite procurement/supply story is from a guy I worked with in the Navy; we needed a switch for some system that required replacement parts to be some super-special reliability grade, so he got the part number and called up the company from home. "Hi this is Billy Joe Ray Bob's electronics supply in Podunk, Lousiana; I need a BR-549 limit switch, how much are they?" The answer was something like $12.

    He calls back a week later as Petty Officer so-and-so from the USS Neveryoumind, and then the BR-549 limit switch costs $349. Apparently the super-special reliability grade sticker they put on it after they take it out of the bin costs $337.

    --
    [b.belong('us') for b in bases if b.owner() == 'you']