US Data Centers Wary of Sharing Energy Data With Feds
1sockchuck writes "The EPA has been seeking at least 100 data center operators willing to share data about their energy usage to help the government develop an Energy Star program for data centers. Thus far, only 54 data centers have signed up, which suggests that few data center operators are eager to tell the government exactly how much energy they are using. The EPA issued a report to Congress last year on data center power usage, and is already developing an Energy Star program to rate servers. Can a program designed to rank the energy efficiency of appliances and computer monitors be a useful tool in addressing the enormous energy consumption of data centers?"
Some people dont share data with the gubmints not because they are evil but because they dont trust the government. Rank the efficencies of data centers? Cant the people who own/run the energy centers do that themselves? You know, read the labels on the devices and such?
So 54 data centers responded out of "over 100"? That seems pretty good to me. How many of the rest just didn't know how much energy they used, or couldn't be bothered to look it up?
Tic-Tac-Toe, Global Thermonuclear War, and relationships all have the same winning move.
But it is a completely different story when it comes to the energy consumed in transportation. There is no viable alternative to gasoline for cars, diesel for trucks and kerosene for the airplanes in the near future. Nothing. And all the crude oil we import goes to transportation.
The politicians are clueless dumb idiots who go through the motions of doing something, on the crazy logic, "we must do something, it is something so we are doing it".
sed -e 's/Chuck Norris/Rajnikant/g' joke > fact
The total energy used in a data center is just the sum of the energy used in the various component parts. The components include the various boxes of electronics, the power supplies, the lighting, and the cooling.
Every data center operator is intensely interested in power consumption. The power and cooling cost real, serious money. Any reduction in that cost goes straight to the bottom line. And, we have finite power and cooling for the building, so if/when the needs of the various boxes exceed those limits, we have to do expensive and disruptive upgrades.
If every component part (computer, network switch, ups, monitor, etc.) were labeled with its power and cooling requirements, data center operators would use that information to select equipment that costs less to operate. In the life cycle of a piece of equipment, the electricity to operate it is a big part of the cost. When we go to buy new equipment, we usually have to choose from among several different units that could fit the purpose. The numbers that determine the operating cost absolutely would be used during that selection process.
A publicity campaign, like "Energy Star" could help us to paint the business "Green". But the numbers are what we really need to make rational business decisions.
Perhaps a lot of the datacenters are more leary of "homeland security" putting spyware, etc in their datacenter. Once you let the goverment in to take a look, who knows how much further they will want to go.
There are probably at least Two reasons that this was ignored 1) The form letter from the Government was ignored like unsolicited credit card application. 2) The data center in question needs their people to work on projects instead of collecting information for said Government.
Calvin:Do you believe in the devil? Hobbes:I'm not sure man needs the help.
Our data center had a catastrophic failure last year when the generator test failed and the operators didn't notice they had no power until the UPS died 15 minutes later. Absolutely everything lost power, and we spent the day recovering systems from various messy states. The exception was our Tandem, used for our clinical system, which was kept alive by a series of D batteries powering the CPU. We used to make fun of those D battieries, but never again.
In any case, our data center is part of a larger facility and while it's easy to report on overall power use for the facility, it's mixed in with so much else that it's hard to get a good estimate for power use by the data center alone. As we found out the hard way, the UPS wasn't adequate for downtimes longer than 15 minutes. We've since made a big push to improve the UPS and reduce the number of physical servers in the data center (switching to virtual whenever possible).
One place wasn't a dedicated data center. There were corporate offices of a handful of companies in addition to the one that owned the building. One of those companies ran their own small datacenter (100 machines or so) an the company that owned the building ran 2 (different departments). The amount of power their own used were estimated, and they just ran UPS's that ran over that. The company that ran their own datacenter also paid on an estimated basis of the total amount of power they used. Large portions of the building that were not associated with the datacenter were also on the UPS/Generator in the event of a power failure. They didn't track how much power per circuit was used and they didn't track how much each of those rooms used. They had a big, overall picture.
"I use a Mac because I'm just better than you are."
OK /.ers, how would YOU categorize or classify data centers to provide a little more sanity|classification|taxonomy to this generic study? For example:
Transaction Processing Center
High Performance Computing Center
Corporate Support Data Center
Web Host or ISP Data Center
Search Engine Data Center
Have at it.
Invenio via vel creo
You can cherry-pick all you want. In the end, the US government over the past 40-50 years has been defined by policies that would be considered "conservative" in most parts of the globe.
Much of the legislation you mention was either inevitable, the work of their predecessors, or had little to no impact.
That said, even though I don't particularly like Bush at all, he has had a small number of bright moments. His most recent Veto of the $288 billion farm bill was absolutely the right thing to do, even though republicans and democrats alike overwhelmingly overrode the veto to let their pork-barrel projects go forward.
-- If you try to fail and succeed, which have you done? - Uli's moose