Setbacks Cast Doubt On NASA's Ares Project
stoolpigeon writes with this excerpt from an Orlando Sentinel article about the Ares program, which paints a bleak picture of the program's future: "Bit by bit, the new rocket ship that is supposed to blast America into the second Space Age and return astronauts to the moon appears to be coming undone. First was the discovery that it lacked sufficient power to lift astronauts in a state-of-the-art capsule into orbit. Then engineers found out that it might vibrate like a giant tuning fork, shaking its crew to death. Now, in the latest setback to the Ares I, computer models show the ship could crash into its launch tower during liftoff. "
... that engineers at NASA have formed a group to develop an alternative to "Ares", because of the perception that it was too little for too much effort. And the fact that NASA has so far rejected their plan without having looked at it seriously.
I have been saying this for years now: NASA has been dropping the ball when it comes to man in space. It has been doing great with robotics, but otherwise has been dropping the ball.
You want to see another man on the moon from the United States? Make it a $10 Billion dollar prize. NASA blows that (or pretty close) on a single Shuttle launch. I bet private industry would do it in under 10 years.
NASA has been losing it, big time. Can they make a comeback? I would be the happiest person if they did. But I have my doubts.
There are going to be setbacks. Mistakes will be made. For the most part these rocket surgeons do the job, on time.
Personally, I'd like to see them re-engineer the Saturn V. Didn't it run linux?
Why should we worry about setbacks? The Delta IV Heavy is launching just fine and could have easily done the job. All that they would have had to do would be the man-rating of the spacecraft and the redesign of the fairing. Additionally, the Delta IV Heavy has a lot of upgrade potential. Cross feeding propellant and adding additional strap-on boosters could easily double its capacity. And should I also mention that you can shut off the engines on the Delta IV if you have a problem (which might be convenient when you are transporting humans who don't like to explode when malfunctions occur).
You also have a conceptual error. The problem is with the Ares I, not the Ares V. The Ares I is a crappy 25 tonne rocket that is being built because it will provide pork to Utah. The Ares V, which also supplies pork to Utah, is the 130 tonne ultra heavy lift rocket that is in the same class as the Saturn V.
Suddenly, the hairy finger of a familiar monkey tapped me on the shoulder. It was time.--G. T.
And like a large software project it also might be a lot of hoopla about day to day operations.
If someone posted an hourly press release for my internal work process at work it would also be full of failures. "Gavin wastes an hour on an idea which goes nowhere." "Gavin thinks he has found solution but actually finds more problems." "Gavin runs projections and determines his initial idea would result in a complete failure."
I would like to know whether the project is actually off track--or just working through the problems that are a result of doing something difficult. With any large project you spend most of your time screwing up. My favorite anecdote is from one of the editors of Apocalypse Now. They calculated the number of individual edits they made in the film and divided it by the number of days they were editing. If they had been able to work without any mistakes and just cut the film they would have only needed to cut two shots per day.
One job I landed for a summer while I was in school for aerospace engineering was as an apprentice helicopter mechanic. I would always catch flack for being an engineer and every little design flaw in the airframe was my fault (even though some of the airframes were built well before I was even born). Sometimes their complaints were legitimate, however other times I could give them an educated guess as to why the engineer designed something a specific way even though it may be more difficult to maintain. As with everything in life there are trade offs in the designs.
That job was not only a lot of fun, but it also gave me a pretty unique insight that a lot of engineers don't get into what happens after the product is designed and out the door. Because of that experience the maintainability of a product is something that I try to keep in high regard when I'm going through the design process because I have been on the receiving end of some really bad designs that could have been (IMO) easily avoided.
This is one of the reasons, and I know people will cringe when they read this, I actually believe that engineers make the better managers than someone who's just "a manager". When you have someone who has gone through the process and knows what the challenges are, they're going to make better decisions in the long run. If you throw someone with a suit at a project who has little to no technical background you're going to run into the PHB problem.
[side rant]The same type of thing goes for the engineers. During work on the project there should be at least one engineer who has a background in safety, reliability, and maintainability (usually a systems engineer) to go over the work and point out major flaws in the design that can easily be fixed at that stage rather than after the product has been developed and you get complaints from all the mechanics. Unfortunately this seems to be something that a lot of companies forgo because it can be a very expensive process.[/side rant]
What NASA seems to have is a disconnect between levels of workers. The engineers are saying one thing and the managers are doing another. I understand that trade offs need to be made when managing a project, but from what I've read there have been a lot of poor decisions in those areas. I'm not a part of all these shenanigans but I have former classmates who are on that project. One major problem NASA has is politics, not only within the organization itself but politics in DC for funding and everything that comes with it. That will gum up the works of any major project faster than incompetence.