Slashdot Mirror


Falcon 9 Is Now Fully Integrated At Cape Canaveral

RobGoldsmith writes "SpaceX's Falcon 9 is now fully integrated: an update from Elon Musk states 'Falcon 9 is now fully integrated at the Cape! Today we mated the 5.2 m payload fairing to the Falcon 9 first stage. This was the final step in the integration process — one day ahead of schedule.' New images are now available showing the first fully integrated Falcon 9 Rocket. Once the launch mount and erector are complete, SpaceX will transfer Falcon 9 on to the erector and raise it to vertical early in 2009."

5 of 82 comments (clear)

  1. Re:Interesting Question by cmowire · · Score: 3, Informative

    Oh, no, the shuttle did take advantage of the weight. It's just not hundreds of tons. And they needed to make the tank even lighter to send the ISS up.

    I suspect the big reason why the shuttle tank's paint took up so much weight is that the paint is going on rough insulation, not a slick metal skin. And the tank is also fairly huge, given it holds liquid hydrogen.

    So I suspect that the weight cost for painting something like the Falcon 9 isn't nearly as bad, given it's an aluminum skin. And there may be some engineering reasons too.

  2. Actually not that much weight saving by pgfuller · · Score: 4, Informative

    You are out by several orders of magnitude - 600lbs / 272kg was the weight saving from not painting the ET. Later structural design changes reduced the ET weight by a more significant 17,000lbs.

  3. Re:Out of order? by MtViewGuy · · Score: 3, Informative

    The R-7 rocket and its descendants the the Russians developed was designed to be assembled on its side because it was easier to assemble the final rocket that way. The only downside to this method is you need big and heavy rigs to move the rocket to the vertical launch position (if you've seen the launch pads at the Baikanour cosmodrome they have a lot of erecting machinery at the launch pad to move the rocket to the vertical position).

    That's why for the Saturn V rocket, NASA decided to assemble the rocket vertically, but that needed a very large building to do this, hence the very tall Vertical Assembly Building (VAB) not only to accommodate the height of the rocket but the overhead cranes to lift the various rocket components.

  4. Re:It's a space salesman race! by Spotticus · · Score: 3, Informative

    The failures of the N1 were more related to lack of sufficient funding, poor quality control and lack of any test stands (The first time the N1 fired it's 30 engines was during its first flight attempt). There was nothing inherently flawed in the approach they Soviet's took, it's just that the engineers were forced to do it on the cheap The first flight failed due to the engine control system shutting down all engines on the first stage after a problem was detected with one of the engines (an engine fire). Second flight was almost the same problem, except one of the first state engines exploded after it ingested a wrench that someone left in the fuel line. During the third flight an unexpected interaction between the engine thrust and prevailing winds resulted in a roll that exceeded the command authority of the rocket and it broke up. The Last flight almost successfully completed it's first stage burn, but a few seconds before shutdown the N1 was designed to shutdown 6 engines to keep thrust within design limits. The shutdown resulted in unexpected pressure transients, the fuel lines ruptured and the vehicle broke up.

  5. Re:It's a space salesman race! by cmowire · · Score: 3, Informative

    32 chambers, not engines. Not the same thing.