220-mph Solar-Powered Train Proposed In Arizona
Mike writes "An ambitious Arizona company has recently revealed plans for a solar powered bullet train that will streak across the desert at 220 mph, traveling from Tuscon to Phoenix in 30 minutes flat. Proposed by Solar Bullet LLC, the system comprises a series of tracks that would serve stations including Chandler, Casa Grande, Red Rock, and Marana, and may one day be extended to Flagstaff and Nogales. The train would require 110 megawatts of electricity, which would be generated by solar panels mounted above the tracks." Local coverage of the plan takes a harder look, noting that Solar Bullet LLC is two guys who are now asking local governments in the towns at which such a train would potentially stop for $35K for a legal and feasibility study. Total cost is estimated at $27B.
Arizona is not fit for human habitation. Best plan for Arizona is for all the people of Arizona to move to places like Pittsburgh, where there is plenty of water and nice homes for dirt cheap prices. That will be lot more green, enviro friendly etc etc than this nonsense about 220 mph train that connects two points in the desert.
sed -e 's/Chuck Norris/Rajnikant/g' joke > fact