US Offering $45M For Huge Wind Energy Test Bed
coondoggie writes "On a day when one of the largest wind farm plans bit the dust, the US Department of Energy is offering up a five-year, $45 million grant to design and build a large dynamometer facility for testing 5 to 15 MW rated wind turbines and equipment. The DOE says such a facility is needed as the US has fallen behind other countries in the race to build ever-larger wind turbines for energy production. According to the DOE, the average size of wind turbines installed in the United States in 2007 increased to roughly 1.65 MW. Additionally, turbines already developed range in the 2.5 MW to 3.5 MW capacity sizes; with plans being developed for even greater power ratings. The larger wind turbines have outpaced the availability of US-based testing facilities, the DOE stated."
Hopefully they'll be able to test in the House of Congress because all that hot air is going to increase efficiency.
Wouldn't it be cheaper in these days of cutting back to piggyback off of their research instead. NIH is the biggest waster of money ever. Study success everywhere you find it.
"It's the height of ridiculousness to say for those 9 lines you get hundreds of millions."