Slashdot Mirror


Large Hadron Collider Struggling

Writing in the NY Times, Dennis Overbye covers the birthing pangs and the prospects for CERN's Large Hadron Collider (which we have discussed numerous times). "The biggest, most expensive physics machine in the world is riddled with thousands of bad electrical connections. [And] many of the magnets meant to whiz high-energy subatomic particles around a 17-mile underground racetrack have mysteriously lost their ability to operate at high energies. Some physicists are deserting the European project, at least temporarily, to work at a smaller, rival machine [Fermilab's Tevatron] across the ocean. ... Technicians have spent most of the last year cleaning up and inspecting thousands of splices in the collider. About 5,000 will have to be redone... Retraining magnets is costly and time consuming, experts say, and it might not be worth the wait to get all the way to the original target energy [of 7 TeV]. Many physicists say they would be perfectly happy if the collider never got above five trillion electron volts. Dr. Myers said he thought the splices as they are could handle 4 [TeV]. 'We could be doing physics at the end of November,' he said in July, before new vacuum leaks pushed the schedule back a few additional weeks. 'It's not the design energy of the machine, but it's 4 times higher than the Tevatron,' he said."

4 of 371 comments (clear)

  1. Re:Magnets by Rei · · Score: 3, Informative

    Yes, you can store energy in strained magnetic fields -- so-called "spin batteries". But it's poor energy density. Magnetic "batteries" are still trying to get up to the energy density of supercapacitors, which are in turn still trying to get up to the density of lead-acid batteries, which have been left in the dust by techs like lithium ion batteries. But it's a very new tech, so we'll have to see where it goes.

    --
    Aeris Died For Your Sins.
  2. Re:Don't Settle by Late+Adopter · · Score: 2, Informative

    Aside from the electrical connections, the magnets need to be trained to reach the fields necessary to sufficiently bend a 7TeV beam. The last talk I heard on the status of the magnets was that this was a very non-linear effect. We could probably get to 5, 5.5 with not that much difficulty (again, when the electrical connections are repaired)... but even getting to 6 will take *quite* an investment of down-time. The cost/benefit curve has a very clear kink in it.

  3. Re:Lazy Europeans by spire3661 · · Score: 4, Informative

    Sigh, typical American 'work yourself to death' mentality...I say this as an American.....

    --
    Good-bye
  4. Re:5000 bad joints != cutting edge, It's ineptitud by mako1138 · · Score: 2, Informative

    The connections are between copper bus bars. Superconducting material is typically clad in copper and it's the copper that gets soldered together. The joints need to have a resistance of less than 25 nano-Ohms, which seems to be the difficult part.

    http://gordonwatts.wordpress.com/2009/07/05/energy-vs-power-vs-heat-vs-oh-no/