UPS Setup For a Small/Mid-Size Company?

An anonymous reader writes "We're a small company employing ~30 people and we are becoming increasingly reliant on virtual servers. Unfortunately, the hosts they are on don't have redundant power supplies because we simply don't have the capacity. We currently have one UPS per rack, which gives us about two minutes. This may have been enough time when they were put in — they've been there for some time — but it isn't really enough time to shut everything down in the event of a failure. Domain Controllers alone may take up to 15 minutes. So I'm looking at upgrading the UPSs to ones that would preferably give us around 15 minutes of breathing space and send an email or text alert when a failure is detected. Something that could trigger shutdowns automatically would also be nice. Of course cost is a key factor too. so given all of the above, what does Slashdot recommend?"

8 of 260 comments (clear)

  1. Have you tested the UPS lately? by plopez · · Score: 5, Insightful

    This is sort of off topic, but when was the last time you tested the UPS units that were installed "some time ago". The batteries can eventually go flat. You better check what you have ASAP. You may need to replace them sooner than you think.

    I can't remember the brand, but some of the higher end UPS units I have used came with monitoring software. They software polled the UPS unit, and started the shutdown as soon as a power failure caused the switch over to battery.

    HTH.

    --
    putting the 'B' in LGBTQ+
    1. Re:Have you tested the UPS lately? by TheLink · · Score: 3, Insightful

      The trouble with most UPS battery tests is they involve putting the stuff on battery...

      If you have a server with redundant power supplies- then you can have each power supply attached to a different UPS, then you can test each UPS one by one, hopefully without the server going down due to one UPS failing the battery test.

      You don't necessarily want to shutdown immediately. I have my machine shutdown once the software thinks there's only X seconds of battery life left. Set X to something high enough so that there's enough time to shutdown AND cold boot AND shutdown again... Otherwise in event of a shutdown you will have to wait some hours till the UPS is charged enough before it is safe to power up - in case the power company or whoever cuts power on you half way during your boot up :).

      --
  2. 1st. Identify Requirements by narziss · · Score: 5, Insightful

    It's not about the amount of people, servers, or a fixed time limit to preserve power. First and foremost, you need to identify what the critical systems are that need to be protected. These may include the VM farms, NAS storage, obviously the underlying network infrastructure, and at the very least, some management terminals that can be used in the event of a failure. Once you identify these systems you need to reference the electrical in/output specifications. If possible, you would want to measure the real requirements in production with inline monitors or passive taps. After you have built your requirement set (mind you, you may decide it's better to have a few small UPS vs one very very large one) you need to explore what needs to be up, and for how long, and build yourself a model. There are dozens of UPS manufacturers, and tens of thousands of combinations for any sized company. Once you have an outline of the systems and their individual power requirements, coupled with your own requirements for their availability/protected power, it will be relatively easy to build yourself a good level of protection on a small budget. Mind you these devices (UPS) can often be found on the second hand market due to company refresh, datacenter closures, etc. Many can be easily re-certified by the manufacturer directly or a variety of 3rd party vendors who specialize in this type of infrastructure.

  3. Diesel by mangu · · Score: 4, Insightful

    No matter how much battery capacity you have, it will eventually run out. If your site truly needs availability, you have to get a diesel generator.

    1. Re:Diesel by Colin+Smith · · Score: 4, Insightful

      If your site truly needs availability, you have to get a diesel generator.

      lol.

      If your site truly needs availability, you need a second site.

       

      --
      Deleted
    2. Re:Diesel by mangu · · Score: 3, Insightful

      Protection against backhoes is a redundant path, not a redundant site.

  4. Leave it to the professionals by chill · · Score: 4, Insightful

    Co-locate your equipment at a carrier-grade data center in the nearest major city to your location and get a leased line to your premises. A decent data center will have proper battery backup and generators and know how to handle it. They'll also have the time and manpower to do proper tests, etc.

    --
    Learning HOW to think is more important than learning WHAT to think.
  5. Re:1st. Identify Requirements by JWSmythe · · Score: 4, Insightful

    It's not about the amount of people, servers, or a fixed time limit to preserve power.

        You're absolutely right. One place I worked had about 20 employees, 150 servers, but had an income of millions per year. The income averaged out to about $5,700/hr. 12 hours of outages per year could cost almost $70,000 in lost revenue. Is it worth $10k in extra equipment to mitigate that? Obviously.

        Smaller companies have to evaluate their acceptable losses. Sometimes it's not worth $100 to make sure you stay up through power outages.

      "5 9's" of reliability still leaves 1.14 hours per year of outages. Of course, that doesn't assume that it's all power related outages. Redundancy across physically diverse locations can and will help there.

    --
    Serious? Seriousness is well above my pay grade.