Astronauts Having Trouble With Tranquility Module
Coldeagle writes "Astronauts ran into trouble while trying to connect up the new Tranquility module onto the ISS. A critical insulating cover didn't fit quite right: 'The fabric, multilayered cover is supposed to go between Tranquility and its observation deck, but the metal bars are not locking down properly because of interference from a hand rail or some other structure at the hatch.' One has to wonder if this is another imperial/metric snafu."
Atleast in scientific application there is no reason to use Imperial. Metric makes all calculations simpler, and is accepted by a much larger portion of the world, and should be the standard in all science.
-EL
Another preemptive strike: for anyone planning to say Fahrenheit is better because you can think of it as "percentage of warm", I call b/s:
The Hubble misfocusing problem wasn't due to English-metric stuff. A contractor was assembling an optical apparatus and was supposed to be adjusting the focal length to a point inside some hollow cylindrical cap with a hole bored in its center. When adjusting their eyepiece they missed the hole, and centered instead on a shiny point near the edge of the cap that was also reflecting laser light, because the paint had been scratched there. They couldn't get the focus knob to rotate far enough as they would need to get this paint scratch into focus, so they drove out to a hardware store, bought some flat washers, inserted them on the threaded rods holding up the laser, and elevated the focusing section out a bit so they could dial the focus length to properly get the length to the scratch right.
One has to wonder if this is another imperial/metric snafu.
Probably not. From the article:
The $27 million, Italian-built observation deck sports the biggest window ever flown in space. In all, there are seven windows that will offer 360-degree views.
The 11 astronauts aboard the shuttle-station complex opened the door Friday to the $380 million Tranquility, also made in Italy for the European Space Agency. The door leading from Tranquility into the observation deck was opened soon afterward, and that's when shuttle pilot Terry Virts and Kay Hire encountered the cover problem.
So, now even submitters aren't reading the article? Damn...
Show me on the doll where his noodly appendage touched you.
Any thermodynamics guy will tell you that "twice the boiling temperature of water" is 473.15 C.
The problem has been fixed, it was interference by some bolts.
"Late Saturday, the space station's commander, Jeffrey Williams, reported that bolts seemed to be causing the interference. He removed all eight bolts, saying the clearance would be tight but that the cover likely would fit. It did, with some coaxing Sunday."
http://apnews.excite.com/article/20100214/D9DS3UOO1.html
Even if this gets modded up to +5, it's going to be buried under a dozen pointless and irrelevant posts about imperial vs. metric ...
From the ISS Flight Director briefing on NASA TV at 1:30pm today:
http://www.space-multimedia.nl.eu.org/index.php?option=com_content&view=article&id=5693:sts-130-iss-flight-director-update-fd-7-8&catid=1:latest
[transcribing] "Crew was able to use their eyes and hands and gave good info on interference along with photos, Jeff has had a lot of hands on the hardware and he's given us the best info. His info allowed us to validate what he's seeing with our records on the ground. Actual interference is just a bolthead, that caused us to question our clearance analysis. We went back and looked at it since we don't want clearance issue when we install Cupola on nadir, and found that we have more clearance than originally expected."
From the Flight Day 8 "execute package" sent up around 3pm to the Endeavour astronauts:
( http://www.nasa.gov/pdf/426345main_FD08.pdf )
"Because of your excellent work in checking interferences, we are now comfortable with
proceeding with cupola depress and relocate today!!! Thanks so much!!!"
From the NASA TV schedule, Tuesday:
CUPOLA MLI REMOVAL 10:39 PM EST / 03:39 UTC
After that the windows can be opened, which is what we're all waiting for!
One simple rule for its versus it's
I work for Boeing (the main contractors for the ISS) and the problem is that the cover will not retract over one of the CBM (common berthing mechanisms) where they wish to install the Cupola. It is actually no impact to Tranquility which is working wonderfully so far. This issue has at this time already been resolved and the Cupola is being relocated to this area, while PMA-3 (Pressurized Mating Adapter #3) is being relocated to where the Cupola used to be. This was done so that the Cupola could face the earth and create all those fantastic views everybody envisioned from the ISS, while being able to be launched in the shuttle payload bay.
Step 1: Land ISS.
Step 2: Test Fit
Step 3: Spend 20 years and billions of dollars reorbiting ISS.
Nerd rage is the funniest rage.
The rest the world has to deal with english, American technical terms, corporations, IP laws, military bases, a hysterical anti-terror crusade and occasionally our messed up measurement system. Yet Americans can't handle having to transition to metric because it would be too hard and too difficult. The greatest generation could have done it, but not the current ones - its beyond their abilities.
Legacy parts? live with it. Eventually, they stop being produced anyhow. It can take decades to move hardware but a ton of stuff can be moved quickly.
Bunch of wimps. I know, I live here.
Democracy Now! - uncensored, anti-establishment news