Slashdot Mirror


1,200 NASA Layoffs, Shuttle Fuel Tank Plant Shuts Down

As the space shuttle program winds down, 1,200 NASA workers were laid off today, and thousands more will lose their jobs in the months ahead. "Many shuttle workers held out hope that they could find new jobs in the Constellation program, which would have included two new rocket systems and a new crew module to transport astronauts into space. From the beginning, Constellation was plagued by underfunding. This year, Obama killed the program's future funding because of budget overruns and because it was behind schedule. That could affect more than 20,000 workers along Florida's space coast, according to Rice." This comes alongside news that Lockheed Martin has stopped work at the production plant that supplied 136 external fuel tanks for the space shuttles since 1973.

2 of 236 comments (clear)

  1. Bush ended the Shuttle program in 2004, not Obama by jbeach · · Score: 4, Informative

    Reading the article, Bush actually ended the shuttle program back in 2004. The article further says that if Obama signs a NASA budget bill that authorizes another shuttle mission, those workers could stay employed for one mission longer.

    What Obama is ending is Bush's proposed "shuttle replacement" program, the Constellation. Much as I'd like to see space exploration continue, if the Constellation is already behind schedule and over budget I can understand it. Especially in this current climate.

    It's definitely going to hurt Democrats in Florida though.

    --
    The Invisible Hand of the Free Market is what punches workers in the nuts.
  2. Re:How depressing by ravenspear · · Score: 4, Informative

    So, is NASA going to build a DIRECT launcher now or will there be yet another politically-driven paper study of an over-engineered, under-performing white elephant?

    The 2010 NASA Authorization bill recently passed by Congress mandates a new vehicle called the Space Launch System that will have to lift a minimum of 70 tons, evolvable to 130 tons with a second stage.

    The bill states that the vehicle will have to be completed by the end of 2016 within a budget of $11.5 billion.

    The only real option for a rocket of this capacity that can be built within this time and budget is something like the DIRECT architecture. NASA still has to decide the specifics though.