Economy Puts US Nuclear Reactors Back In Doubt
eldavojohn writes "Remember those 30 new nuclear reactors the US was slated to build? Those plans have been halted. A few years ago, it seemed like a really good idea to build a bunch of nuclear reactors. The environmental impacts of other energy production methods were becoming well known and the economy was tanking. Well, natural gas is now much cheaper, and as a result it looks like building a single nuclear reactor in Maryland is such a risky venture that Constellation can't reach an agreement with the federal government for the loans it needs to build that reactor. The government wants Constellation to sign an agreement with a local energy provider to ensure they'll recoup at least some of the money on the loan, but Constellation doesn't like the terms. So, the first of those thirty reactors has officially stalled, with no resolution in sight. It looks like it'd take an economic meltdown to trigger nuclear reactor production in the US."
It's much harder (note I said harder, not impossible) to create base load generation for a grid from solar/wind than from nuclear. It requires some sort of energy storage (either a battery, or pumped reservoir, etc) to do so from wind and solar, and if a long enough period of time with the wrong kind of weather happens that base vanishes. If we had *tons* of solar and wind, all over the country balancing load, and very efficient transmission from coast to coast I suppose it would solve that problem, but it's both a technical problem and a chicken/egg problem.
"goodbye and hello, as always" ~Prince Corwin, from Zelazny's Amber series
A major cost of nuclear reactors is the bickering of the NIMBYs. Construction can take fifteen years (ten for bickering, five for construction). An investor could be investing in something else which makes money during that time so to convince him to invest in your plant you have to garantee massive returns in the future.
Wikipedia has a page on the economics: http://en.wikipedia.org/wiki/Economics_of_new_nuclear_power_plants
No sig today...
When a utiltiy builds a nuclear power plant, they are not only funding the cost of the plant itself, they are also funding 100% of your fuel cost up front plus containment and future disposal costs. See http://www.world-nuclear.org/info/inf02.html for the basis for some realistic cost estimates.
While it is cheaper for the consumer in the long run to run nuclear, there is a huge up front cost associated. Most banks will not accept the risks without an expensive reward. Governments can finance these types of needed infrastructure loans at a much better rate and reap the rewards (cheaper energy for the masses). If given the choice for the utilities to use an expensive bank loan or a cheap government loan, I am going to hope they choose cheap government loan. All of the costs of producing power are passed on to the customer in the rates paid by the customer. Utilities are regulated entities, and as such, are entitled to recoup the cost of providing service to the customer in the rate charged.
--I like turtles...
Jimmy Carter banned them by executive order.
Regan overturned the order but no one has tried to build one since then regardless.
it will just sit there with a website detailing its budget, schedule, and design as a lesson to us all.
Meanwhile I watch with interest that China is building LOTS of old fashioned reactors: http://en.wikipedia.org/wiki/Nuclear_power_in_China
"The country is expected to build around 22 reactors in the five years ending 2010 and projected to build 132 units after and has the most aggressive nuclear power expansion program in the world."
I won't be surprised if they get rather experienced at building nuclear reactors, and build them for cheaper and cheaper. Hopefully without decreasing safety too much ;).
False. The economic collapse without that money in a much bigger way. Think 25% unemployment followed but another 10%+ the following year as house are lost in the millions.
Also, we got most of that money back.
Yes, thats sign the remaining loans over to a private company, what could go wrong.
The Kruger Dunning explains most post on
I seriously doubt that westinghouse has anything to do with Thorium based reactors not being on the short list despite their many benefits http://en.wikipedia.org/wiki/Thorium#Key_benefits). I would say it has far more to do with the lack of ability to produce weapons with their byproducts. The US would prefer to get a little something extra out of the deal.
Looking at the Wikipedia page, most the claimed benefits for thorium are no different from those of an appropriately designed modern uranium reactor ("no possibility of a meltdown, it generates power inexpensively, it does not produce weapons-grade by-products .. will burn up ... nuclear weapon stockpiles"), the one signficant different claim ("will burn up existing high-level waste") is not true.
It can correctly be said that the high level waste from a thorium reactor would be about half that of a uranium reactor, but given the small volume of the current waste stream this gives small actual advantage.
Thorium reactors are a perfectly viable technology, but it is relatively undeveloped, and thus has much longer lead times, and much greater up front costs for no significant advantage.
The Achilles heel of nuclear power has always been the high capital costs, which means a longer period before profitable returns, and thus greater risk. It is simple hard-headed investment decision making that has kept nuclear power plants form being built. With thorium this problem is magnified.
If we can't get an established technology like uranium reactor built, thorium has no chance at all.
Starships were meant to fly, Hands up and touch the sky - Nicky Minaj
Are you aware that Oak Ridge built and operated one successfully for 5 years nearly half a century ago?
Does the fact that the project was a complete success not factor into your definition of "almost completely unproven"?