SpaceX Falcon 9 and Dragon Make It To Orbit
jnaujok writes "This morning the Falcon 9 rocket carrying the Dragon capsule lifted off from Cape Canaveral at 10:43 Eastern time, after an earlier launch had been scrubbed because of a bad telemetry feed. A little over 9 minutes later, the Dragon capsule separated from the second stage into its intended orbit. Part of the COTS (Commercial access To Space) program, this is the first test of the Dragon capsule by SpaceX to prove it can be used to ferry supplies to the ISS. The Dragon capsule will make two or three orbits before returning to Earth about four hours after launch."
I didn't get around to making this a separate submission, but I figure folks might be interested in another SpaceX-related news item from an interview with Elon Musk. As some of you know, Congress has mandated that NASA construct a super-heavy lift rocket (at least 75mt payload) by 2016. This is expected to use cost-plus contracts, utilize as many Shuttle components/workers as possible, and is expected to cost at least $10B.
SpaceX has another (IMHO much better) proposal, though, which would be to build a 150mt rocket that's essentially an upgrade of the rocket which was launched today. This rocket would be able to lift heavier payloads than the Saturn V. SpaceX proposed to do this with a $2.5B fixed-price contract, where SpaceX eats any cost above this amount. Some remarks from Musk on this:
http://cosmiclog.msnbc.msn.com/_news/2010/12/06/5600599-spacex-gets-set-for-next-giant-leap
He's even starting to think ahead to the next giant leap -- the development of a super-heavy-lift rocket, more powerful than the Apollo era's Saturn 5, which could put 150 metric tons of payload into Earth orbit. Musk said facilities in Utah, Alabama, Ohio, Florida and other places around the country could be involved in the project, and he's willing to build the rocket for $2.5 billion. "Anything above that, SpaceX will pay for," he promised. ...
Musk said his $2.5 billion figure for a super-heavy-lift rocket was based in part on the concept that 80 percent of the money Congress is expected to devote to heavy-lift development would go toward the standard cost-plus method for funding spacecraft development, with 20 percent going to the kind of fixed-price, milestone-based approach that is being used for the NASA program that's funding SpaceX's effort. "I find myself in this bizarre position where people are saying, 'You couldn't possibly do it for such a low amount as $2.5 billion,'" he said. "And actually, I have trouble trying to figure out how we'd spend so much money. In order to get to $2.5 billion, I'd have to assume that a whole bunch of things go horribly wrong during the development process."