Obama Calling For $53B For High Speed Rail
Antisyzygy writes "President Obama is calling for $53B to be appropriated for the construction of high-speed rail in the United States over the next 6 years. Assuming Congress approves this plan, the funding would be spent on developing and/or improving trains that travel at approximately 250 miles/hour, as well as spent on connecting existing rail lines to new developed high speed lines."
It doesn't matter if it goes 250mph if it sits on the track for an hour waiting for right of way. Granted, this is just one experience, but from reading up after it happened, it seems to be the norm. Back in 1999 I decided to take a leisure trip out to Arizona from Indianapolis and I decided to take a train for fun. Instead of a speedy ride up to Chicago, we ended up waiting for an hour on a side track to get right of way. On the way from Chicago to Flagstaff, AZ, at one point we sat on the tracks during the day for 3 or 4 hours waiting again for right of way. On the return trip the train was 5 hours late getting back to Chicago and I missed my connection train back to Indianapolis.
Sure, you can build a high speed train, but if its run by Amtrak and exists in this countries rail system mentality, it will quickly become worthless. Fix the real issues.