Slashdot Mirror


Intel Launches Sandy Bridge-E Series Processors

MojoKid writes "Today marks the release of Intel's Sandy Bridge-E processor family and its companion X79 Express chipset. The first processor to arrive is the Core i7-3960X Extreme Edition, a six-core chip manufactured using Intel's 32nm process node that features roughly 2.27 billion transistors. The initial batch of Sandy Bridge-E CPUs will feature 6 active execution cores that can each process two threads simultaneously via Intel Hyper-Threading technology. Although, the chip's die actually has eight cores on board (two inactive), due to power and yield constraints, only six are active at this time. These processors will support up to 15MB of shared L3 Intel Smart Cache and feature integrated quad-channel memory controllers with official support for DDR3 memory at speeds up to 1600MHz, as well as 40 integrated PCI Express 3.0 compatible lanes. Performance-wise, Sandy Bridge-E pretty much crushes anything on the desktop currently, including AMD's pseudo 8-core FX-8150 processor."

13 of 204 comments (clear)

  1. Crushes anything on the desktop by CubicleView · · Score: 5, Funny

    So it's very heavy then?

  2. A bit underwhelming by Kjella · · Score: 4, Informative

    Honestly, with a $500+ entry tag plus cooler which is not included plus expensive, low volume motherboard you might want to compare to a dual processor Xeon machine rather than other desktops for some alleged server/workstation stability too. Performance was as expected, 6 cores to 4 so it's faster in well-threaded workstation applications, not that different otherwise.

    What's disappointing is the platform, no USB 3.0, two SATA 6 Gbps ports, no SAS support, it seems like PCI express 3.0 made it in but no cards support it yet so there's nothing besides the processor that really screams high end. Well that and 8 memory slots if you feel 4x4GB isn't enough but there's alternatives like the old high end it replaces with 6 slots or 8 GB sticks that have been showing up lately - pricey but you can get 4x8GB for less than one of these CPUs. Don't get me wrong, it's the undisputed performance king but it's like the same car with a souped up engine and fuel system yet none of the features that say this is a $100k Ferrari.

    --
    Live today, because you never know what tomorrow brings
  3. Wait for Ivy Bridge. by wildstoo · · Score: 5, Informative

    That's nice and everything, but I'll wait for Ivy Bridge, which is due March 2012.

    According to Wikipedia:

    Ivy Bridge feature improvements from Sandy Bridge were expected to include:

    Tri-gate transistor technology (up to 50% less power consumption)
    PCI Express 3.0 support
    Max CPU multiplier of 63 (57 for Sandy Bridge)
    RAM support up to 2800MT/s in 200MHz increments
    Next Generation Intel HD Graphics with DirectX 11, OpenGL 3.1, and OpenCL 1.1 support
    The built-in GPU is believed to have up to 16 execution units (EUs), compared to Sandy Bridge's maximum of 12.
    The new random number generator and the RdRand instruction, which is codenamed Bull Mountain.
    Next Generation Intel Quick Sync Video
    DDR3 low voltage for mobile processors
    Multiple 4k video playback

    So yeah, just hang on for the die shrink if you care about performance and power consumption. My next system will definitely be Ivy Bridge based.

    1. Re:Wait for Ivy Bridge. by L4t3r4lu5 · · Score: 4, Insightful

      16 EUs. Woah. For comparison: nVidia and AMD's current cards have over 1500 of them.

      So this is like comparing a consumer-class lawnmower to a Bugatti Veyron, graphics-wise.

      Why would anyone with such a extreme setup ever care for such shitty integrated graphics? And whatÃ(TM)s the point of DirectX 11 support, if you can't use it anyway.

      Because you can power off the graphics card and still do 1080p HD video decoding, or play some lower-end games. That'll shave a good 300w off of your total power usage. Not to be scoffed at.

      --
      Finally had enough. Come see us over at https://soylentnews.org/
  4. Re: Cough by beelsebob · · Score: 4, Informative

    It doesn't replace LGA1155 it replaces LGA1366, which is 3 years old. These chips are server and workstation level chips.

    Intel's next desktop architecture is called Ivy Bridge, will be released in the first 3 months of next year, and will be using LGA1155. Ivy Bridge E will use LGA 2011. Only in about 20 months time (by which point LGA1155 will be 3 years old) will Haswell come out on a newer socket.

  5. Re:Socket by beelsebob · · Score: 5, Informative

    In this instance, no, this is a new socket, replacing LGA1366. Next year though intel will release new desktop CPUs based on the current LGA1155 for desktops.

    Intel actually don't release things on new sockets as much as people think. Every tick/tock pairing has one desktop socket, and one server socket, this is the server socket to go with LGA1155's desktop socket. The tock to come (Ivy Bridge) will also use LGA1155 for desktops and LGA2011 for servers.

    This is much the same as has happened before: Nehalem introduced LGA1156 and LGA1366, westmere reused them; Conroe introduced (properly) LGA775 and LGA771, Arandale reused them.

  6. 6 or 8 cores by spaceman375 · · Score: 5, Funny
    The chip has eight cores, they all work, but you can only use six. The other two are reserved for the DHS and cronies. I, for one, do NOT welcome our dual-core overlords.

    (I've always wanted to start a conspiracy theory.)

    --
    On the one hand you take life too seriously, and on the other, you do not take playful existence seriously enough. Seth
  7. Re: Cough by beelsebob · · Score: 5, Insightful

    When buying hardware, trying to future proof is dumb. You could try to "future proof" now and buy a $1500 system. In 3 years it'll be shit though.

    Alternatively, you could buy a $600 mediocre system now, and another $600 system in 2 years that'll be faster than the above $1500 one. The result will be that you've spent $300 less, you've got machines that are reasonably current for 4 years, and the system you get out at the end is faster.

  8. Re:$1000 processor vs the world by hansamurai · · Score: 4, Insightful

    Because it actually provides context on how much better (or not how much better) that $1000 processor is. Plus, how many other desktop $1000 processors are out there to benchmark against? Certainly nothing from AMD.

  9. Are we looking at the same chart? by Sycraft-fu · · Score: 4, Insightful

    What I see is the 2600k, the 4 core $300 chip, matching or beating the Bulldozer, and the 3960X beating everything by a decent margin.

    You are correct in that the Bulldozer doesn't have much to worry about from the new E series as they are much higher priced and compete in a different market. What it does have to worry about is the regular SB chips, which are killing it. Even when things are stacked in what should be its favour: Heavily threaded tasks, the SB does as good or better. Then if you take many other tasks that are not as multithreaded, the SB pulls way ahead.

    THAT is the BD's big problem... Well that and the fact that the Ivy Bridge comes out in a few months. The E series is just for people with too much money. In the consumer market, the regular SB is an amazing performer.

  10. What else are they supposed to bench it against? by Sycraft-fu · · Score: 5, Informative

    There are only three things that you can bench it against usefully:

    1) The 2500/2600k CPUs that are the high end for the consumer boards. The question there is "What do I get moving up to the much more expensive E series?"

    2) The top of the line AMD Bulldozer. The question there is "How much faster is Intel's high end than AMD's high end?"

    3) The previous Intel high end, the i7-990X. The question there is "How much faster would it be if I upgraded?"

    In all cases, you are talking a very high priced, over spec'd part. There are no other chips in its category really. It is for people who demand the max performance and aren't concerned with the stiff price premium to have it.

  11. Re: Cough by Anonymous Coward · · Score: 5, Insightful

    The result will be that you've spent $300 less, you've got machines that are reasonably current for 4 years, and the system you get out at the end is faster.

    You're also sending twice as much to the garbage pile.

    I know this isn't a consideration for most, and it's all but encouraged through the new "disposable electronics" thing that's crept up over the last decade, but at some point we need to consider that some considerations extend beyond the financial, even when talking about buying consumer goods.

    For instance, I know people that buy a new printer every time their starter ink runs out because it's still cheaper than buying replacement ink cartridges. Three times a year they're throwing a perfectly good printer into the trash. Yeah, it saves them money, but does that really make it right to throw it in a landfill? I have a hard time saying yes.

    Maybe if we required manufacturers to subsidize the disposal of their goods when such goods are non-biodegradable it would help do something to eliminate the whole "designed for the dump" phenomenon?