Inside the Mummification of Space Shuttle Discovery
longacre writes "When Space Shuttle Discovery goes on display at the Smithsonian next month, it will be a shell of its former self, with most of its critical systems removed. This article has a behind-the-scenes look at the removal of the engines and their replica replacements, as well as photos of the orbiter in various states of deconstruction. 'From the very beginning it was understood by all parties involved — including the orbiter recipients — that the orbiters will be made safe and inert prior to display, as was made clearly evident in NASA’s request for proposals to house the orbiters. Discovery’s preparation for display took a year and cost approximately $28 million. Since the Smithsonian is a federally owned institution, this cost was borne by the U.S. government, unlike the other institutions that have to foot the bill for the preparation and delivery of the orbiters. The price tag did not stop the frantic push to get one by an eager group of contenders. At stake was not only a piece of American history and the prestige of housing an orbiter but the potential draw for millions of new paying visitors to the recipient museums.'"
The sad thing is how those engines are going to be put back to work: As a component on the SLS rocket, where they will be shot into space and left to burn up in re-entry as yesterday's leftovers to be literally thrown away.
These engines are some of the most advanced rocket systems ever designed, and purpose built to be reusable, so the only design choice NASA has is to throw them away on expendable rockets?
Not only that, but when NASA runs out of SMEs for the SLS rocket, they will have to come up with a new engine at huge expense, put it through a testing regime, and more or less redesign the rest of the rocket as a whole new vehicle anyway. Even from a financial savings viewpoint I fail to see how that is going to save any money, much less how SpaceX (to give an example) will have spent less for its entire rocket program than NASA is going to spend on this "refit" after the SLS is used up. More like spend about 3x the amount of money that SpaceX has spent to date for everything they've done.
I don't know if I'll have the stomach to witness such waste when the SLS finally flies. Then again, I have significant doubts as to if that program is going to survive into the next presidential administration in America. It isn't even slated to fly until 2017 at the earliest, so it will be somebody other than Barack Obama as president and somebody other than Charles Bolden as administrator of NASA even if it does fly.