lucky4udanny writes "My client says any software/website we develop for them should be supported with bug fixes forever, with no further compensation. We have generally supported our work for two months, to give the client adequate time for real-world testing, after which we charge by the hour for all support. How long should a company fix bugs without compensation in software they developed? What is the industry convention?"
Too right. Been on the receiving end of that "but our processes have changed" phone call. The analogy I use is "Let's say I'm a tailor who makes a suit for you. Now you gain weight and expect me to fix it for free?".
On the other hand....
Forever is a long time. There is no reasonable expectation of forever in any legal contract for goods or services in any
industry I'm aware of. Even contracts for burial plots do not last much more than 200 years.
Sure, a wise contractor will have a warranty duration mentioned in the contract, and specify an acceptance testing phase, after which
all bugs belong to the purchaser. Any bug fixes offered after that are likely to require additional payment.
Without such a Ts Crossed and Is Dotted contract, there are only reasonable expectations to fall back on:
Both sides know that there is no such thing as bug free software. Never has been. Never will be.
Expectations to the contrary are not reasonable, and never have been.
Expectations of indentured servitude went out with the 13th amendment, and no contract can bring that back.
Further, rare is the software that enters service and remains unchanged for its useful life. Any warranties or assurances
are lost once the code is modified, even if modified by the same developer, but especially when another developer
steps in, or the purchaser themselves make changes. Even without a contract that states this, one need only
point a finger at the changes made by others to divert ALL blame.
The two month time period mentioned in the story and "adequate time for testing" seem a little thin if you ask me.
I would never sign a contract for custom software that was so tightly limited, and it does not sound reasonable for any project of any reasonable scope.
So without something in writing, the contractor deserves a little pain and suffering (as a stupidity penalty), but they are STILL not up the creek without a paddle, because "forever" is not reasonable, and reasonable expectations become the deciding factor. But in this case "reasonable" is no longer strictly the contractor's call, and courts may well have a say.
Sig Battery depleted. Reverting to safe mode.
This is what a maintenance contract is about. Generally there are three parts to a maintenance contract. One is that you will charge a set fee for any changes or new work (potentially with a yearly retainer to cover your costs in being ready to do this work) and the other part is that for every year that they pay a fee you will fix any bugs. Often this second part has a year or so included with the initial work.
The first part of the contract might also cover preventative maintenance such as checking to see that the hardware is functioning, backups are being done, and that nobody is messing with the software.
Where you really need to cover your ass is in two areas. One is their losses. You can't be responsible for them. If the system is down for 30 minutes during a critical sales pitch they could argue that you just cost them a billion dollars. The other is if they ruin things somehow. If they have someone else mess with the system or they don't do backups, or use sub standard hardware then you need to be able to wash your hands.
The third critical part is the breakup clauses. If they become a pain in the ass or your company just morphs into something where the old clients are a distraction you need to be able to walk away. The best way (and something they should insist upon) is the source and documentation they would need for them to be able to hand the contract over to someone new in a second. Personally I would refuse to deal with a company that didn't provide this.
But most of all I would never in a million years commit myself to a company like that. Not just because it would be stupid but also any company that would insist on something so douchey is going to be the biggest bunch of scum to deal with. I could see them insisting that new work and upgrades come under the purview of fixes. "Oh we have moved to a new OS and your software broke." I tried accessing it with an iPad 9 but they don't use HTML anymore so you need to fix that." Then knowing they have you over a barrel they would say, "If you just make it compatible with our new database, OS, and mobile devices we will let you out of the contract in 2 years."
Lastly maintenance is where many companies make the big bucks. I witnessed where a letter was capitalized and the company billed $1,200. This was in a scripted environment and implemented by a single developer with no complicated QA process. He just logged in directly and VI'd the script.
As for this client, you're probably not obligated to anything that's not in writing (IANAL, talk to one.) The "Get it in writing" sword cuts both ways. Tell him you're going to review the support terms in the original contract. Whoops, couldn't find any. Then offer to negotiate some.
I'm trying to teach myself to set people on fire with my mind... Is it hot in here?
I don't know what his app is, but I look at it this way (and is how I handle something I write):
Is this a bug?
Assuming it is then:
is this something that is obvious code error (i.e. buffer overflow, null pointer, etc.)? I fix it.
Is this something that is behavior not as expected, but is not a code error (logic error), and should have been seen as part of acceptance testing? I charge for the fix.
really simple, and so far I've not had any customers balk.
-nB
whois gawk date unzip strip find touch finger mount join nice man top fsck grep eject more yes exit umount sleep dump
This guy has it right. Deadlines go both ways.
I once had a client where the project manager handling our contract often sat on deliveries for a month or more before looking at them -- and here I am with a three man development team dedicated to this project. Finally we fly down install the production software and train the users. A week later the project manager is fired and nobody looks at the system for over two years until a new manager starts to procure a system and realizes that his predecessor already paid for one. Word gets to the board of directors, and then we get letter threatening.to sue us for not delivering the system.We have no way of proving to them that we flew a team down there and actually did the installation and training, because everybody we trained had subsequently left the organization. But we had the bills we submitted that were paid by the client, which is at least prima facie evidence we did the work.
Now we had the source in our source code control system, but so much time had gone by that just getting all the stuff together needed to build and package the system would have been a pain (this is why you should be using maven, folks, which we weren't at the time). And there is no doubt the system was probably so riddled with bugs that getting it working would have taken much, much more work, but the client made it impossible for us to deliver a quality product. The project manager accepted deliveries with only cursory examination, and so late that it forced us to work on this product intermittently, dropping it and picking it up weeks later.
The lesson is build client responsibilities and support limitations into the contract.
Standing behind your work doesn't mean delivering unlimited support. It means delivering more than you promised. That starts by setting clear limits and conditions on what you are promising.