Excessive Modularity Hindered Development of the 787
TAGmclaren writes "The Harvard Business Review is running a fascinating article exploring the issues facing Boeing's Dreamliner. Rather than simply blaming outsourcing, as much of the commentary has been focused on, the article delves into the benefits of integration and how being integrated when developing a new product gives engineers more degrees of freedom. From the article: 'Historically, Boeing understood that, and had worked with its subcontractors on that basis. If it was going to rely on them, it would provide them with detailed blueprints of the parts that were required — after Boeing had already created them. That, in turn, meant that Boeing had to design all the relevant pieces of the puzzle itself, first. But with the 787, it appears that Boeing tried a very different approach: rather than having the puzzle solved and asking the suppliers to provide a defined puzzle piece, they asked suppliers to create their own blueprints for parts. The puzzle hadn't been properly solved when Boeing asked suppliers for the pieces. It should come as little surprise then, that as the components came back from far-flung suppliers, for the first plane ever made of composite materials... those parts didn't all fit together. Time and cost blew out accordingly. It's easy to blame the outsourcing. But, in this instance, it wasn't so much the outsourcing, as it was the decision to modularize a complicated problem too soon.'"
Welcome to the 21st century, I hope your trip from 1950 was a comfortable one! Here in the 21st century computers have advanced to the point where we don't need to physically prototype things anymore - it can, and has been, done digitally for well over a decade now. In fact, one of the most complex things that man is currently building (a nuclear submarine, something else new to you but take my word on it) are now routinely and successfully designed and built without any physical prototype.
Seriously - you and a bunch of other commenters are utterly clueless as to the state-of-the-art of over a decade ago. Boeing has built (IIRC) three new aircraft now (plus major upgrades like the new 747) using completely digital design, visualization, and validation tools. While it's not entirely a mature technology, it's not new and very complex vehicles are and have been in service for years that were designed and built using it.
Prototyping persists with smaller items because the requisite systems and software are so expensive, and is enabled by the fact that the teams involved are relatively small and simple, physically located in one place, and the prototypes are relatively cheap and new ones can be turned around (at worst) in a few weeks. On the other hand, a mockup/prototype of something like a nuclear submarine or a major aircraft can cost tens of millions of dollars (or more) and take a year or more to assemble. To assume that the latter must prototype because the former do is... ludicrous at best.
The problem here isn't lack of prototyping, it appears that they tried to extend the process too far and the management systems weren't weren't set up properly to handle the new process.