Decommissioning San Onofre Nuclear Plant May Take Decades
gkndivebum writes "Southern California Edison has elected to decommission the San Onofre nuclear plant after a failed effort to upgrade the steam generation system. 'Nuclear economics' is the reason stated for the proposed decommissioning. Other utilities operating nuclear power plants in the US likely face similar decisions when it comes to weighing the costs of upgrading older facilities. Allowing the reactors to remain in 'safe storage' for a period of up to 60 years will allow for radioactive decay and lower radiation exposure for the workers performing the demolition."
http://en.wikipedia.org/wiki/Renewable_energy_in_Germany
In 2012 The German electricity sector increased its coal usage by 4.9 percent over its coal consumption value of 2011.[43] This increase in coal usage was largely due to a power gap in Germany created after the nation shutdown 8 of its 17 nuclear power plants.[44] The shortfall in electricity supply from these 8 power plants, is primarily being filled by building more lignite coal burning power plants.
Yeah, real good job Germany, thanks for the CO2 increase...dicks.
The licencing for nuclear reactors in the US, the UK and a few other countries requires that the site be returned to greenfield status after the reactor(s) on site are decommissioned. That means total demolition of the structures including the metre-thick reinforced concrete containment buildings.
In some cases if the site is to be reused immediately then the reactors are demolished quickly with special handling of the slightly radioactive pressure vessel which has suffered neutron activation. It costs a little bit less to wait a few decades for that radioactivity to decay at which point the demolition can go ahead with no radiation-specific problems. The real problem during demolition in either case with older (1970s vintage) reactors is the presence of asbestos in pipe lagging, tank insulation etc.