Next-Gen GPU Progress Slowing As It Aims for 20 nm and Beyond
JoshMST writes "Why are we in the middle of GPU-renaming hell? AMD may be releasing a new 28-nm Hawaii chip in the next few days, but it is still based on the same 28-nm process that the original HD 7970 debuted on nearly two years ago. Quick and easy (relative terms) process node transitions are probably a thing of the past. 20-nm lines applicable to large ASICs are not being opened until mid-2014. 'AMD and NVIDIA will have to do a lot of work to implement next generation features without breaking transistor budgets. They will have to do more with less, essentially. Either that or we will just have to deal with a much slower introduction of next generation parts.' It's amazing how far the graphics industry has come in the past 18 years, but the challenges ahead are greater than ever."
Some nerdy sheeple won't believe what I've just said about Intel's lies. Well Intel gets 10 million transistors per mm2 on its 22nm process, and AMD, via TSMC, gets 14+ million on the larger 28nm process. Defies all concept of maths when Intel CLAIMS a smaller process, but gets far less transistors per area against a larger process.
Comparing apples and oranges are we? Yes, AMD gets 12.2 million/mm^2 on a GPU (7970 is 4.313 billion transistors on 352 mm^2) but CPU transistor density is a lot lower for everybody. The latest Haswell (22nm) has 1.4B transistors in 177mm^2 or about 7.9 million/mm^2, but AMD's Richland (32nm) has only 1.3B transistors in 246mm^2. or 5.3 million/mm^2. Their 28nm CPUs aren't out yet but they'll still have lower transistor density than Intel's 22nm and at this rate they'll be competing against the even smaller Broadwell, though I agree it's probably not true 14nm. Very well formulated post though that appears plausible and posted as AC, paid AMD shill or desperate investor?
Live today, because you never know what tomorrow brings