Utilities Fight Back Against Solar Energy
JoeyRox writes "The exponential growth of rooftop solar adoption has utilities concerned about their financial future. Efficiency gains and cost reductions has brought the price of solar energy to within parity of traditional power generation in states like California and Hawaii. HECO, an electric utility in Hawaii, has started notifying new solar adopters that they will not be allowed to connect to the utility's power grid, citing safety concerns of electric circuits becoming oversaturated from the rapid adoption of solar power on the island. Residents claim it's not about safety but about the utility fighting to protect its profits." We mentioned earlier the connection fee recently approved in Arizona. Do you have a solar system? If not (or if so, for that matter), does this make you think twice about it?
I don't understand why the utilities simply don't build out their grids to accept feed-in from customers' solar rigs, and then split their pricing structure into 1) grid access, and 2) net power supplied? Or is this too simple?
Why yes indeed... I imagine there exists some real progress if the utilities have begun to fear it.
Happiness in intelligent people is the rarest thing I know.
Ernest Hemingway
I work for Maui Electric which is a subsidirary of HECO. I am posting AC for this reason. I am copying part of a news release that we gave to these customers to help them understand. "On Sept. 6, the Hawaiian Electric Companies announced they were enabling more small PV systems (10 kW and under) to be added without a potentially time-consuming interconnection study and possible safety upgrades. The new threshold for a possible study was set at the point at which the PV on the circuit reached 100% of that circuit’s daytime minimum load, increased from 75%. At the same time, with a growing number of circuits with high amounts of PV, Hawaiian Electric also announced that customers who want to add PV on circuits that have reached the more liberal 100% threshold would need to await the results of an interconnection study to ensure their PV system can be safely interconnected into the grid. Previously, when PV levels were lower, O‘ahu customers had been allowed to interconnect their systems while they were awaiting final Hawaiian Electric approval of their net energy metering contract. Some customers with loans and/or contractual obligations for a PV system at the time of the announcement were caught in the transition, facing the possibility of being unable to get the benefits of a PV system they had committed to buy or had already installed" We are not denying any customers Solar, Hawaii leads the nation in KW generated per customer. (Solar Electric Power association Rankings). Hope that clears up some questions people may have.