How Does Tesla Build a Supercharger Charging Site?
cartechboy writes Tesla's Superchargers are the talk of the electric car community. These charging stations can take a Model S battery pack from nearly empty to about 150 miles of range in around 30 minutes. That's crazy fast, and it's nothing short of impressive. But what does it take to actually build a Tesla Supercharger site? Apparently a lot of digging. A massive trench is created to run high-capacity electric cables before the charging stations themselves are even installed. A diagram and photos of the Electric Conduit Construction build out have surfaced on the Internet. The conduits connect the charging stations to a power distribution center, which in turn is connected to a transformer that provides the power for charging cars. It took 11 days to install the six charging stalls in Goodland, Kansas. If you thought it was a quick process to build a Supercharger station, you were clearly wrong.
Having just completed a 6 charger installation I can tell you that the digging is the hard part. In our case it was a little over 3 weeks start to finish due to allot of landscaping and blacktop work as well as installing a dedicated half mega Watt transformer complete with piping to the utility service box some 90' under a road that we could not disturb. On the technical side, the prints are fairly detailed and the charging stations and controllers (one charge controller per pair of stations) are well engineered. The insides are modular and have a liquid cooling system for the 12 charge packs. Each charge cabinet is fed with 3 phase, 480VAC at 175Amps. The output of the controller can be as high as 410VDC at 120Amps per charge station. Of course I doubt it ever really gets there. Ultimately, for the electrician, it is a simple install and nothing to technical.