Slashdot Mirror


Battle of the Heavy Lift Rockets

schwit1 writes: Check out this detailed and informative look at the unspoken competiton between NASA's SLS rocket and SpaceX's planned heavy lift rocket. It's being designed to be even more powerful than the Falcon Heavy. Key quote: "It is clear SpaceX envisions a rocket far more powerful than even the fully evolved Block 2 SLS – a NASA rocket that isn't set to be launched until the 2030s." The SpaceX rocket hinges on whether the company can successfully build its new Raptor engine. If they do, they will have their heavy lift rocket in the air and functioning far sooner than NASA, and for far less money.

2 of 211 comments (clear)

  1. Re: Why does it take so long? by kellymcdonald78 · · Score: 4, Interesting

    While the "Shuttle Derived" messaging was used to sell the program, it's hardly anything but. The first few flights will use left over RS-25Ds from the shuttle program, but they are far too expensive for new ones to be built and throw away each flight, so the RS-25E and RS-25F engines needed to be developed. The 4 segment SRBs from the shuttle aren't powerful enough for SLS so they've had to develop a 5 segment SRB with a new type of solid fuel with a completely new grain. The casings are also being redesigned to be expendable. While the tank is shuttle derived, it needs a completely redesigned aft section to support the engines, plumbing is completely different, and the a new interstate to support the upper stage and payloads. It would have been cheaper and faster to start from scratch, but that doesn't keep the trough filled.

  2. Re:Competition is good. by Anonymous Coward · · Score: 5, Interesting

    "Or paying a few tens of billions to develop a huge rocket " to who?

    Boeing is the prime contractor for the design, development, test and production of the launch vehicle cryogenic stages, as well as development of the avionics suite.

    TFA: "However, it is clear SpaceX envisions a rocket far more powerful than even the fully evolved Block 2 SLS â" a NASA rocket that isnâ(TM)t set to be launched until the 2030s."

    The difference isn't private/gummint. All companies strive to make money.

    The difference is in the objectives of the organizations involved. The objective of Congress is to get re-elected by keeping the pork flowing. The objective of Boeing is to take as long as possible to build anything because the longer it takes, the more pork flows in. Congress doesn't give a fuck if it ever flies. Boeing would be delighted if the project is funded to 2030, and even more delighted if cost overruns and delays pushed it out to 2050. Everybody has well-paid jobs for life!

    The objective of SpaceX is Mars, bitches.

    Musk needs an HLV long before 2030 if he is to live long enough to be able to retire on Mars. Because he is effectively self-funded, he not answerable to the whims of Congressmen and their pork allocations. Because he is interested in living long enough to see it fly, he is not interested in delaying things to pull as much pork out of the project as possible. He will build the fucking thing himself, and it will fly.