Slashdot Mirror


Technical Hitches Delay Orion Capsule's First Launch

According to NBC news, "A series of delays held up the maiden launch of NASA's Orion capsule on Thursday, adding some extra suspense to the first test of a spacecraft that's designed to take humans farther than they've ever gone — including to Mars." The much-anticipated launch, which had been scheduled for launch 7:05 a.m. Florida time, is to boost into orbit — empty — an instance of the Orion crew capsule intended to be part of a manned mission to Mars. As of shortly after 9 a.m. eastern time, troubleshooting has been in progress on the Alliance Delta 4 launch vehicle's hydrogen fill and drain valves in attempt to make the launch within today's launch window, which extends to 9:44 a.m. Besides the technical problem with those valves, the launch was delayed by wind, as well as by a boat that strayed into a restricted area. (Shades of the stray-boat delay in October for Orbital Science's ISS delivery launch.) Friday and Saturday have been designated as backup dates. Update: 12/04 15:03 GMT by T : The launch has been scrubbed.

1 of 71 comments (clear)

  1. Re:rounding error by Martin+Blank · · Score: 3, Interesting

    While I'm not terribly enthusiastic about the Orion project, I do give them some credit that you clearly don't. A moon mission is to be possible with a single launch, similar to the Apollo missions. (I think a near-Earth asteroid will also be possible in one launch.) I believe a Mars mission is expected to be 2-3 launches, with the last one the manned launch, followed by docking in orbit and then leaving for Mars.

    The setup flying from the Delta IV Heavy is only part of the stack. When the SLS launches, it will have a payload capacity of 130 tons, compared to the Delta IV Heavy's 23 tons. (The Saturn V could lift 118 tons.) That's a lot more hardware and fuel that can be lofted.

    --
    You can never go home again... but I guess you can shop there.