Report: NASA May Miss SLS Launch Deadline
An anonymous reader writes: A post at the Planetary Society's blog summarizes a report from NASA's Office of Inspector General which says the agency will struggle to get launch facilities up and running in time for the Space Launch System's November 2018 launch deadline. "Ground systems are a critical piece of the SLS-Orion infrastructure. All three elements are tightly integrated, with ground systems requiring significant input from the rocket and capsule designs." To be more specific, NASA has found 462 separate inter-dependencies, less than two-thirds of which have been resolved so far. "The Mobile Launcher must be moved into the Vehicle Assembly Building for testing prior to the delivery of SLS and Orion. When it comes time to stack the rocket and capsule for the first flight, there may be a 'learning curve,' said the OIG, where engineers work through unforeseen glitches." They're also worried about having to develop all the software to run these systems before the hardware is in place to test.
If NASA had a bigger budget several years ago, work on launch facilities could have started earlier, and be ready on time. Think of all the stuff sequestration is hurting right now.
Outsource the whole operation to SpaceX or Boeing and then have them be responsible for hitting the deadline.
It won't cost more then what it currently costs, the US will retain the internal capability to do the work... and we'll be able to put real pressure on the whole institution to actually hit deadlines.
They want to get paid? Deliver on the contract.
I've decided to stop wasting my time responding to AC trolls/sockpuppets... so if you want a response from me... login.
we should cut the budget
.5% of the budget.
that has nothing to do with nasa, who brings in some
We can still cut the budget in other areas that are rife with abuse, and not touch (or give more to) nasa
have you seen my sig? there are many others like it but none that are the same
Launching is not the priority, maintaining Shuttle-era pork is the priority. So SNAFU.