Why BART Is Falling Apart
HughPickens.com writes: Matthias Gafni writes in the San Jose Mercury News that the engineers who built BART, the rapid transit system serving the San Francisco Bay Area that started operation in 1972, used principles developed for the aerospace industry rather than tried-and-true rail standards. And that's the trouble. "Back when BART was created, (the designers) were absolutely determined to establish a new product, and they intended to export it around the world," says Rod Diridon. "They may have gotten a little ahead of themselves using new technology. Although it worked, it was extremely complex for the time period, and they never did export the equipment because it was so difficult for other countries to install and maintain." The Space Age innovations have made it more challenging for the transit agency to maintain the BART system from the beginning. Plus, the aging system was designed to move 100,000 people per week and now carries 430,000 a day, so the loss of even a single car gets magnified with crowded commutes, delays and bus bridges. For example, rather than stick to the standard rail track width of 4 feet, 8.5 inches, BART engineers debuted a 5-foot, 6-inch width track, a gauge that remains to this day almost exclusive to the system. Industry experts say the unique track width necessitates custom-made wheel sets, brake assemblies and track repair vehicles.
Another problem is the dearth of readily available replacement parts for BART's one-of-a-kind systems. Maintenance crews often scavenge parts from old, out-of-service cars to avoid lengthy waits for orders to come in; sometimes mechanics are forced to manufacture the equipment themselves. "Imagine a computer produced in 1972," says David Hardt. "No one is supporting that old equipment any longer, but those same microprocessors are what we have controlling our logic systems." Right now BART needs 100 thyristors at a total cost of $100,000. BART engineers said it could take 22 weeks to ship them to the San Francisco Bay Area to replace in BART's "C" cars, which make up the older cars in the fleet. Right now, the agency has none. Nick Josefowitz says it makes no sense to dwell on design decisions made a half-century ago. "I think we need to use what we have today and build off that, rather than fantasize what could have been done in the past. The BART system was state of the art when it was built, and now it's technologically obsolete and coming to the end of its useful life."
Another problem is the dearth of readily available replacement parts for BART's one-of-a-kind systems. Maintenance crews often scavenge parts from old, out-of-service cars to avoid lengthy waits for orders to come in; sometimes mechanics are forced to manufacture the equipment themselves. "Imagine a computer produced in 1972," says David Hardt. "No one is supporting that old equipment any longer, but those same microprocessors are what we have controlling our logic systems." Right now BART needs 100 thyristors at a total cost of $100,000. BART engineers said it could take 22 weeks to ship them to the San Francisco Bay Area to replace in BART's "C" cars, which make up the older cars in the fleet. Right now, the agency has none. Nick Josefowitz says it makes no sense to dwell on design decisions made a half-century ago. "I think we need to use what we have today and build off that, rather than fantasize what could have been done in the past. The BART system was state of the art when it was built, and now it's technologically obsolete and coming to the end of its useful life."
They're not conflating old with obsolete; they're suggesting that a bespoke, cutting-edge system that didn't turn into a template has left BART on a tree branch all by itself, and thus has engendered its obsolescence.
You misunderstand. The designers of the BART in 1972 did conflate "old" with "obsolete". The designers thought that the tried-and-true rail standards were obsolete, so they created something new that was up-to-date with the standards of the aerospace industry. Aerospace was a modern, thriving industry at the cutting edge of technology. And it was the coolest industry to work in--aerospace engineers could tell their friends that there were "rocket scientists", and they would be granted instant respect and admiration.
Gotta pitch in additional praise for the MAX at PDX. In spite of its origins (a giant money-sink/boondoggle made to enrich political friends), it operates nicely, and covers most of the metro area quite well. I've used it lots of times on business trips, where the missus drops me off at Hillsboro (the west end of the line), and I take it to PDX no sweat. Drops me off right at the airport.
Now if you take a MAX at 2am, you'll see the occasional meth head or homeless dude looking to warm up, but otherwise it's perfectly safe nearly any time you take it.
By the way, BART also goes right to SFO (wish it went to OAK as well - it would save massive cab/uber/shuttle fare costs that way).
Quo usque tandem abutere, Nimbus, patientia nostra?