NASA Is Studying A Manned Trip Around The Moon On A $23 Billion Rocket (buzzfeed.com)
An anonymous reader shares a report on NASA's ongoing work on a manned trip to the moon. From the report: Without a new administrator even nominated yet, NASA's acting head Robert Lightfoot on Wednesday requested a study of whether next year's first flight of the Space Launch System rocket, billed as the most powerful NASA has built, could have a crew of astronauts. "I know the challenges associated with such a proposition," Lightfoot said in a letter to his agency, citing costs, extra work, and "a different launch date" for the planned 2018 Exploration Mission-1 (EM-1). The mission would be launched by the massive SLS, which is still in development, then boosted by a European service module to put three astronauts inside the new Orion space capsule on a three-week trip around the moon. NASA first sent three astronauts around the moon in 1968 in the Apollo 8 mission. The last astronaut to stand on the moon, the late Gene Cernan returned to Earth in 1972. The new talk of a repeat moon-circling mission, aboard an untested spacecraft, has space policy experts variously thrilled, dismissive, and puzzled. "I frankly don't quite know what to say about it," space policy expert John Logsdon of George Washington University said. Writing on NASAWatch, Keith Cowing called the study request a "Hail Mary" pass to save the life of the SLS ahead of Trump installing a budget cutter to head the space agency. The Government Accountability Office estimates the costs of SLS and its two planned launches (a second, crewed mission is planned for 2023) at $23 billion.
Could you describe to me what is the "Obama space malaise"?
Obama didn't want SLS. It was congress that mandated it. And I'm in agreement: SLS is a giant unfunded mandate. "Let's build a rocket that will be way too expensive to make significant use out of, and which we won't have the budget to use often enough to make reliable or at all cheaper".
You don't make mandates that you're not going to fund. So much of congressional NASA mandates have been make-work programs, trying to justify keeping Apollo and Shuttle-era facilities open - the cost of keeping those facilities open inherently making anything that they do very expensive. It's no mystery that they need to cut back and streamline their operations to be competitive. But they're not allowed to.
Honestly, I'd like to see NASA become in many ways NACA again. An science agency with a focus on advanced research projects that help improve aerospace technology and understanding in ways that others can make use of. Now, exploration is in many ways part of that. But "NASA as a rocket manufacturer" strikes me as akin to the government running a passenger jet manufacturer or the like. I see the current situation as totally backwards - why should NASA be redoing the tech of the 1960s, while private companies are the ones doing innovations like first stages that return to pad for reuse? It should be NASA developing new technology and the private sector exploiting it.
And this was the approach that the Obama administration was pushing for, with the very successful COTS program. There are many things I have to fault it for, but this is not one. I mean, seriously, how weird is it that Republicans are pushing for things to be run by a big government agency that does everything internal, and Democrats pushing for greater privatization and outsourcing? ;)
I'll never forget the last thing grandma said to me before she died: "What are you doing in here with that knife?!?"
Good thing that's not what they're actually doing.
If you read the actual GAO report, it doesn't say the rocket costs twenty-three billion. That's the cost of "the first planned SLS flight, the ground systems for that effort, and the first two Orion flights." In other words the costs to meet certain early program milestones, including costs which should properly be amortized across the lifetime of the rocket and crew vehicle.
The actual per launch cost of just the SLS system is supposed to be about $500 million, or 2% of the $23 billion figure.
That's still a lot of money. Even if you go with expendable costs of half a billion, and billions for the whole mission for sure, well, it's a lot of money just to prove you still have big balls. Not that that's completely unimportant, but I'd like to know what the manned component does for the mission besides make it more complex and expensive and therefore a more impressive demonstration of our manhood.
Post may contain irony: discontinue use if experiencing mood swings, nausea or elevated blood pressure.