An anonymous reader writes:
Tesla's electric semi-truck will be launched three weeks later than planned, CNN reports. It's been bumped to November 16th because Tesla says it's "diverting resources" to address problems with its Model 3 sedan production -- they've produced just 17.3% of the cars they'd planned -- and to make more batteries to send to areas hit by hurricanes. CNN notes Tesla's Model X "didn't start shipping until two years after it was supposed to roll out," and production of its Model S sedan "was also much slower than originally promised." Michelle Krebs, an analyst with Autotrader.com, complains Tesla "may well have far too much on its plate. It should focus and deliver on some key promises."
But Elon Musk "has a history of some pretty pie-in-the-sky promises," complained CNN business anchor Maggie Lake, citing Musk's claim that he had verbal approval for an underground hyperloop connecting New York City to Washington D.C. ("This is news to City Hall," said New York's press secretary at the time, and no actual approval has ever been produced.) Lake also noted Musk's promise to fix South Australia's blackout problems by building the world's largest lithium-ion battery within 100 days back in March. Last Friday Tesla signed a contract to begin the work, so the 100-day countdown has begun.
CNN's report ran under the headline "Elon Musk: Big Dreamer or Monorail Salesman?" -- referencing a satirical 1993 episode of The Simpson's. "Here's a spoiler alert," the segment concludes. "If you haven't seen that episode...the monorail plan doesn't work out too well. Let's put it that way."
But Elon Musk "has a history of some pretty pie-in-the-sky promises," complained CNN business anchor Maggie Lake, citing Musk's claim that he had verbal approval for an underground hyperloop connecting New York City to Washington D.C. ("This is news to City Hall," said New York's press secretary at the time, and no actual approval has ever been produced.) Lake also noted Musk's promise to fix South Australia's blackout problems by building the world's largest lithium-ion battery within 100 days back in March. Last Friday Tesla signed a contract to begin the work, so the 100-day countdown has begun.
CNN's report ran under the headline "Elon Musk: Big Dreamer or Monorail Salesman?" -- referencing a satirical 1993 episode of The Simpson's. "Here's a spoiler alert," the segment concludes. "If you haven't seen that episode...the monorail plan doesn't work out too well. Let's put it that way."
I've always wondered how many people would be driving electric cars if it wasn't for the state/Fed subsidies (rebates) or other benefits like Leaf's free charging. Though Elon Musk, as of 2015 had benefited from almost $5B in Gov't subsidies.
I see people driving $100k Teslas, and they're not doing it to be green. It's the new status symbol of wealth (used to be BMW/Benz).
If there's one thing that has become very clear it is that Musk is not good at estimating how long something will take. At the same time, when he says it will happen, it does generally happen. The really good example of this is SpaceX. The Falcon 9 took far longer to get off the ground and be really reliable than he predicted, but once it did, it became an absolute monster in the industry. More than a third of all rocket launches worldwide this year are SpaceX launches http://www.popularmechanics.com/space/rockets/a27290/one-chart-spacex-dominate-rocket-launches/ and the projections suggest that will be more than half next year, even without the Falcon Heavy (which is another example of this since it has taken much longer but will eventually go). The real issue with Tesla is that if things go slowly enough then the other car companies will essentially out-compete him; but by his own description he's essentially ok with that, since the primary point of Tesla was help deal with global warming.
Also, saying he only delivered 17% of the cars they had planned is distorting the truth a bit. They planned to deliver 100 in August and 1500 in September, ramping up to around 5000 a week by the end of the year. So if they only delivered just over 200 cars in September, that's less than a month's delay which is peanuts compared to other Tesla delays in the past.