Why are Businesses Willing to Spend More for Software?
"I recently had a the chance to bid on a contract, which I didn't win because of my estimated project cost. The winner of the bid had an estimated cost of $15,000 whereas my estimated cost was around $5,000 for the same project. The contract was not a complex project: a system comprised of database-generated web pages, with file submission and minor document management features.
I had, in about 8 hours of preliminary work, 50% of the website and associated back-end completed and had the rest of the site roughed out for what they wanted. The work is simple and I think almost anyone who has done similar types of site designs would agree with me.
The reason I got for not winning the project was that my proposed bid was seen as too low.
Does this make any kind of sense to anyone? Why would a company prefer to spend $15,000 on a project instead of $5,000."
I wish you'd actually put some effort into your trolls.
slashdot!=valid HTML
(The above is sort of a joke. Sort of. Actually, this book frightened and saddened me, and I passionately hate it. I still recommend it, though.)
As copyright owner of this comment, I authorize everyone to defeat any technological measure which limits access to it.
Hopefully, whining will get me my precious lost karma point back. Hey wait a minute, what do you mean this is offtopic too? Wait a minute, I--
As copyright owner of this comment, I authorize everyone to defeat any technological measure which limits access to it.