Money Problems May Derail First U.S. MagLev Train
PSaltyDS writes "The Virginian Pilot is reporting on the trials and tribulations of what was supposed to be the first MagLev train in regular use in the U.S. The MagLev Project was to cover a portion of the Old Dominion University campus, and start service in 2002, but after $14 million spent, it has yet to carry a single passenger. In the article, several engineering types seem to say the same thing, something like 'A great idea that is just too hard to do without an unlimited budget.' Is a maglev train an impractical fantasy like the personal flying car?"
Don't the Japanese already have one? What do the Japanese have that the US does not, to allow them to create a MagLev?
Well I know from Amtrak as i rode it for 4 years while dating my wife. And the problem is not trains themselves.. Amtrak problem is Amtrak. the NEC (north east corridor) Is extremely busy and would be close to self sustaining, but any money it makes is used to subsidize the running of otherwise dead rail lines elsewhere. In NYS the train from NY to albany, montreal, and buffalo are nearly always full. So the passengers are there.
But when you get an organization like amtrak, that launches a supposedly 'high speed' service (acela) that is only 15 minutes faster than the normal train on the same route and costs you twice as much to ride, and cost several millions to build, and was late on its maiden voyage (i think it even broke down). Well This is not a problem with train being obsolete, its a problem with the operator, the operator in this case is Amtrak.
I have about a millions seething hate stories about Amtrak. remind me to tell you one some time.
Agreed 100% on Amtrak. I think the problem is a combination of Amtrak being Amtrak, and the lack of governmental support for Amtrak. The fucking Acela is capable of operating at 125+ MPH, but the state of Connecticut apparently limits its speed legally to 75 MPH. Mind you, this is also Amtrak's fault for not working together with government to sort all this shit out and come up with a technically AND legally sound solution before blowing billions in government subsidized and private capital on stupid projects like this.
There are significant differences between the *operating* speed of a MagLev and of a conventional train.
A MagLev can run at 581 kph as its top speed and its intended operating speed is 500 kph. This is partly because of its acceleration rate and partly due to the infrastructure. It is also much much quieter allowing it to be run closer to commercial/residential buildings.
The TGV has the current top record for a conventional train at a speed of 515 kph. However, it operates at a max of 220 kph. The JR Central line in Japan operates at about 270 kph.
Now, I'm not sayinng that running a short track MagLev was the brightest thing in the world, but for a long run (San Francisco to LA for instance), it can easily outpace a plane after you take into account the thirty minutes you have to wait to get on and off.
Plus, no one is going to crash a MagLev into a building.
The world is neither black nor white nor good nor evil, only many shades of CowboyNeal.
The Birmingham airport maglev (1984-1995) was more ambitious. And it was so expensive to maintain that it was replaced with a cable-driven system.
The only maglev system being proposed that makes any economic sense is the link from Orlando Airport to Disney World. Disney wants to build that so that their customers bypass all other attractions and go directly to Disney property.
Ok, so I forced myself to read the entire article, not easy, its a collection of confused finger pointing, and poor journalistic sound bites, sole intent to fill a news article. Zero Meaningful Content..
:
To summarize
They are concerned about how the project was managed.
Concerned that the investment may not get repaid.
There are problems with the control system (not the magnetic levittation system itself note)
The assets are apparently a series of patents. Thats odd really, considering this is a tewenty year old technology.
The board and the university may have screwed up, they didn't put appropriate bonds in place, so now they are all nervous as to who gets blamed.
A board member now blames the technology, saying that others (Japan) could not make it work. This is incorrect.
Another guy refused to invest because of problems with the company (not the technology).
Maglev trains are described as "floats on a cushion of air". Duh. Fine journalism.
FRA has issued a stop work order, as usual asleep at the wheel. Way way way too late IMHO.
Overall, they all completely mismanaged this, tried to invent new stuff that doesn't work, and now need another two million dollar handout to get out of the hole they dug for us, the victim taxpayers.
Oh, and in the process they tarnish the reputation of a transportation technology we actually need.
Thanks for nothing ODU and FRA guys. Do us a favor, go fire yourselves.
There is no god; get over it already! Never exchange a walk on part in the war, for a lead role in a cage.
Actually, I've done San Fran to Minneapolis, Minneapolis to Baltimore (twice) and about 14 trips Minneapolis to Chicago by Amtrak and it seemed like most seats were full. And most of the trips were pleasant experiences. A restaurant, sightseeing car and a sleeper is my way to see the U.S. pass by. And I like _walking_ to a hotel in the center of downtown instead if being stuck in some butt-ugly hotel park surrounding the airport.
Before you knock Amtrak outside the NW corridor, you know what? THEY DON'T OWN THE TRACKS!! High speed trains -- you've got to be kidding. The _track_ is so bad between Minneapolis and Chicago, several times we've gone about 25 mph for stretches of miles at a time. Woo Hoo! We ain't becomin' no 3rd world country.