Enggirl1 writes "Design News discusses Boston's Big Dig and begs the question - is it one of engineering's greatest failures? The article reveals that forums and blogs are popping up all over the Internet as vehicles for engineers and contractors to discuss, under the guise of anonymity, their skepticism, thoughts and reactions to one of the biggest infrastructure failures in the news today." From the article: "One blogger, whose profile notes that he is an ICC Reinforced Concrete Special Inspector and an ICC Pre-stressed Concrete Special Inspector, among other specialties, says he has nearly 20 years of experience performing both placement and post-placement inspections of rebar, post-tensioning systems, concrete, masonry, etc. He says if structural engineers who specify epoxy for dowels and the like believe that the work is being done correctly then they live in a world unfamiliar to him."

15 of 379 comments (clear)

  1. Maybe not engineering's failures... by aussersterne · · Score: 5, Interesting

    I have a relative who is a civil engineer that has done high-profile (space program, public construction, etc.) work for both the public and private sector.

    From the sound of things, I'd guess it's not an engineering failure so much as a management failure. The things I know about public construction are scary. Like when an engineer can't finish a design under the schedule that management wants, management steps in after hours, "throws in numbers" and tosses together a design, then sends it out with the engineer's seal on it. Or when an engineer refuses to sign off on an incomplete or incorrect design, the manager brings in a new graduate because they're more "cooperative" (read: will sign anything to get a paycheck) and they go ahead and build it that way.

    The cost and political pressure in public engineering projects often leads to engineers being the least powerful people that have input in the design (i.e. ass backward).

    --
    STOP . AMERICA . NOW
    1. Re:Maybe not engineering's failures... by DrMrLordX · · Score: 5, Interesting

      The Big Dig was also plagued by graft and corruption. Much of the work was probably done improperly or on the cheap because contractors and workers alike kept walking off with materials and money (or opening the door for others to do so).

    2. Re:Maybe not engineering's failures... by UnknowingFool · · Score: 5, Informative

      "throws in numbers" and tosses together a design, then sends it out with the engineer's seal on it. Or when an engineer refuses to sign off on an incomplete or incorrect design, the manager brings in a new graduate because they're more "cooperative" (read: will sign anything to get a paycheck) and they go ahead and build it that way.

      I'm not saying those things don't happen. I'm saying that they are highly illegal and not common place. Signing off on a design for an engineer is like preparing legal documents without being a lawyer or giving medical advice without being a doctor.

      To sign off on any engineering or construction documents, an engineer must be licensed as a Professional Engineer (PE). The requirements vary by state but in most states new engineering graduates do not qualify to be PEs. The norm is an engineering student must pass an exam (FE) near graduation, then work under a licensed PE for several years, then pass the PE test. In most states like MA, it is 4 years minimum between passing the FE and even qualifying to take the PE test. Engineers who are not PEs can do some of the work in construction and design fields but are expressly forbidden to do certain things like sign off on plans.

      I agree with you that management is most likely to blame but for another reason. As projects like this become complex, it requires very good management to ensure that the important details are not overlooked. With as many problems as the Big Dig seemed to have before completion, it would seem that the management was not up to the task.

      In the case of the collapse, I think the most likely scenario is that the specifications were wrong or changed at a later date. The load required was specified to be 1/2 of what it needed to be. The engineer approved a wall thickness of so many feet that was later modified and built without approval. The specifications for the wall never included withstanding water (hydrostatic pressure), etc.

      --
      Well, there's spam egg sausage and spam, that's not got much spam in it.
  2. details, details... by r00t · · Score: 5, Funny

    So it has a few bugs to work out. So it was delayed.

    It beat Duke Nukem Forever and even Vista. It's probably better quality too, and will last much longer.

    Patch it up and it'll be fine.

  3. Corruption is the problem by umm+qasr · · Score: 5, Interesting

    I think you'll find most of the problems with the big dig do not stem from any one dumb engineer, but the huge amount of contractors that are awarded contracts by the corrupt locat and state governments. No where in the world have I seen contruction contractors living so well as in Boston.

  4. Inspecting your own work by xXBondsXx · · Score: 5, Insightful

    One of the main problems the team had on the Boston Dig project was that some genius decided to hire the same contractors for both the construction and the inspection of the tunnel. Consequently, the inspector gets put in an awkward position, for if he finds anything wrong, he can either...

    A) blow the whistle, cost the company extra money, and then get fired for "undisclosed reasons"
    B) look the other way like a good little puppet of the company, get paid, and never have to really deal with the consequences face to face

    Seriously, whoever thought that it was a good idea to hire the same company for both construction and inspection is a little naive. Would you let McDonald's do the FDA testing on their own food?

    --
    The voice of the next generation. "In this tower, in my mind..." Babble - Tower
    1. Re:Inspecting your own work by bcat24 · · Score: 5, Funny
      Would you let McDonald's do the FDA testing on their own food?
      McDonalds's serves food? I always thought it was a toxic waste disposal facility.
  5. About rock bolts by Anonymous Coward · · Score: 5, Informative

    Rock bolts are a staple in the mining industry. There are darn few failures. Of course the rock bolts are specified by engineers who work for the mining company and installed by miners whose safety depends on them. You tend to do things better if your life depends on it.

    In the case of the big dig, you have contractors who are trying to make the maximum possible amount of money. I also bet that there weren't enough government inspectors or that they weren't properly qualified. Cutting costs is just as dangerous in the government as greed is in the private sector. The Canadian province of Ontario laid off all their government water inspectors and a bunch of people died in the town of Walkerton. If you don't give folks the tools they need to do a job then you shouldn't be surprised if the job doesn't get done.

    The concrete ceiling tiles were used to create a separate space for supplying air to the tunnel. This is typically how you would do it in a building. In the case of the Chunnel between England and France, they dug a separate tunnel for that purpose. People have wondered why the panels had to be made of concrete. Something lighter would have worked just as well and might have been cheaper and safer.

    1. Re:About rock bolts by schon · · Score: 5, Funny

      I sure as hell know that I would rather have 2 tons of styrofoam fall on my head then concrete.

      Because it would cushion the blow?

  6. problem was contractors, materials and timeframe by eliot1785 · · Score: 5, Interesting

    As a Boston resident I've been following this semi-closely, and it seems that the main problem is not so much the engineering itself, but the way in which the overall planning occurred. This project was started in the late 1980's, and was supposed to cost something like $3 billion and take a few years. Now it has taken more than 16 years and cost tens of billions of dollars.

    It wasn't just a bad estimate - it was that they gradually expanded the scope of the project and added new goals once the project was underway. As a result it took longer and cost more money. Then came the double-whammy - because it took so much time, and occurred at a time when people were moving back into the city making overall traffic worse, they had to revise the project again to make it even more ambitious. Otherwise, when it was done the traffic would still be bad and people would wonder why they spent so much time on a project that didn't solve the problem. So the Big Dig has always been in a race with time, which paradoxically has caused them to take more time than they otherwise would.

    Most of the problems that have happened with the Big Dig have been due not to poor engineering, but use of the wrong materials and deliberate corner-cutting by the contractors. The woman who was killed a couple of weeks ago when the ceiling fell on her car died not because of poor engineering, but because the ceiling part was held up with substandard materials. They actually realized that this was a problem and changed the materials, but not before that part was built, and they never went back and fixed it.

    So the contractors cut corners to make more money than they otherwise would, sometimes illegally. But my theory is that the underlying reason why they were able to get away with it is that the ballooning costs (remember it expanded by a cost of something like 900% in money and 400% in time) made accounting that much more difficult.

  7. Re:problem was contractors, materials and timefram by eliot1785 · · Score: 5, Interesting

    Another thing I would add to my previous post is that the irony is that the traffic alleviated by the Big Dig will come back within 5-7 years. The bottleneck for the Central Artery is the part where it actually goes underneath a skyscraper (technically it does this twice, but the other part isn't as crowded). They can't make it any wider there because it would eliminate the foundation of the skyscraper enough that the whole thing could collapse. This limits the size of the entire Central Artery and will eventually force the city to develop ways for people to get in and out and around using completely different traffic patterns.

    The one major improvement to traffic that the Big Dig accomplished was diverting traffic going to the Airport through a separate tunnel (the one that just had part of the roof collapse). That reduced traffic in the Central Artery by something like 50%. Ironically, that was also the least expensive part of the Big Dig.

  8. Details on the failure by MostlyHarmless · · Score: 5, Informative
    The Boston Globe has been writing some surprisingly in-depth analysis of the failures related to this disaster. Here's what I remember from their reports:

    • Yes, the epoxy-and-bolt system is extraordinarily dumb. It is not yet clear whether the epoxy was installed correctly, but even if it was, they should not have been relying on it. In some of the other tunnels, they built steel I-beams into the sides of the tunnel to hold up the ceiling panels -- a much more sensible system. The tunnel where the panels fell was not originally supposed to have ceiling panels, but they decided later on that they needed them for ventilation purposes; it was now too late to install the more sensible system, and they used this mickey mouse anchoring system instead. (That being said, there were any number of better and epoxy-free ways to design the anchors.)
    • One of the subcontractors looked into using lighter (and significantly cheaper) steel panels instead of the heavy concrete ones, but they ran into problems with vibration. They eventually figured out a solution, but now the steel system would have been almost the same price as the concrete, and another authority (I forget which) had already signed the contract to buy the concrete.
    • The bolts were supposed to be tested to hold twice the weight they would actually be supporting. Instead, they were tested to a margin not much greater than the weight of the concrete panels. Furthermore, it is not clear how many of the bolts were actually tested; this may have gotten swept under the rug due to the extreme cost pressure the project was under.

    As usual with engineering disasters of this sort, the failure seems to have been caused by a confluence of lesser mistakes that would not have been tragic in isolation. The root causes, however, seem to be:
    • Changing requirements late in the game (as any software developer would warn you against)
    • Cutting corners on safety checks due to budgetary concerns
    • Bad design
    • Incompetence and/or curruption on the part of the contractors. Most of the fingers right now are pointing at Bechtel, but who knows what later investigations might reveal.


    Anyone who has lived in Boston can tell you that this is only the latest in a string of cost overruns and management failures. The actual mode of failure (i.e. the bolts) and the immediate causes of that failure should not overshadow the idea that the contractors who screwed this one up should be held responsible. The ongoing investigations should reveal whether the contractors were merely incompetent or whether they willfully ignored problems like these and crossed their fingers that nothing would happen.
    --
    Friends don't let friends misuse the subjunctive.
  9. My experience on site by Anonymous Coward · · Score: 5, Informative

    Posting anon here - I worked on the Big Dig (environmental) during peak construction (1997-2000) and I'm currently contracting with another MA state agency, and I don't want to ruffle any state feathers. I also want to write a book someday ;)

    First a couple of general statements:

    • As another poster mentioned, the Big Dig needed to be built. The traffic situation was untenable. Widening the elevated artery wasn't possible because of space and structural issues. Tearing the existing artery down first and building a conventional cut-and-cover tunnel would have been faster, at the cost of completely destroying the Boston (and MA) economy. Building another highway through Boston wasn't going to happen. A slurry wall tunnel was the best of several bad options, but make no mistake - it was going to be hideously complex and expensive.
    • Contrary to popular belief, there where several major transit upgrades that were (and still are) being built to help offset the traffic on the Big Dig. More transit would have been nice, but transit brings its own set of issues.
    • As for the accident: it was tragic and the responsible party (or parties) must be help accountable. But please don't think that because several MA politicians (including one presidential hopeful and one gubernatorial candidate) hold daily press conferences, that we are any closer to knowing all the facts. It's a complicated problem and it's going to take time.

    Now back to the facts - I have no knowledge of roof panel construction (I spent little time in that area), but I will note that working on the project during 1999 and 2000 was an interesting experience. Already at the point there was heavy pressure on project managers and contractors to reduce costs (this was before the national stories hit that led to the ouster of James Kerasiotes). It got to the point that office supplies were locked up - you had to get the office manager's permission to get a notebook or pens!

    In any event, I wouldn't be surprised at all if cost pressures let to reduced safety factors, etc. The construction site was also the source of many stories about various screw-ups that I won't get into here (wait for my book!). There was of course several times that money was spent to shut people up (at least once against my direct recommendation), but the PTB felt it was needed for the project to move along smoothly. I suppose that it would have been better for B/PB to take the Vista approach, and wait for the tunnel to be "finished" but that wasn't going to happen because of the political pressures.

    Now was the project a failure? I'll just say this - is used to take me 1.5 to 2 hours to drive from Braintree to Cambridge during midday traffic. I did the same trip a month or so ago during a Friday afternoon rush hour in abut 20-25 minutes.

  10. Re:Cheap, Illegal Labor != Good Quality by servognome · · Score: 5, Insightful
    On any project that involves public safety, an English-speaking, literate, educated worker is much more preferable than a non-English-speaking, illiterate, uneducated worker.

    You create a false dichotomy, because there are many American construction workers who can't read the instructions for assembly.
    Quality isn't an illegal immigration issue. Doesn't matter if it's a Mexican illegal or American just off the farm, if they don't have the skills its the problem with the construction company. They didn't do a sufficient job of ensuring their laborers had the skills and ensure the quality of work. Illegal immigrants are just a pool of labor, the impact they have is on the value of labor in certain industries. Those who make hiring decisions are the ones responsible for sacrificing service and quality for price.
    --
    D6 63 0D 70 89 81 BB 8E 7B 7C 5F 5D 54 EA AB 73
  11. Hardly the biggest mistake - an amazing project by CFD339 · · Score: 5, Insightful

    As Yoda might have said, "Break me a fscking give!" --

    The big dig constitutes several of the most ambitious and complex infrastructure projects imaginable. They had to freeze the ground in the back bay by piping supercooled fluid through it while digging in that part. They have completely re-routed one of the largest transportation networks in the world without closing the old one (other than a few hours at a time at night or weekends). As the last phases are completed -- the cleanup of the old site -- Boston becomes one of the most beautiful cities in the world. What used to be a hideous elevated six lane highway becomes a walking park with small shops, museums, and playgrounds that connects the entire downtown area from Haymarket and Fanuel Hall past the New England Aquarium, all the way to South Station.

    It was typically corrupt on a scale only an eastern (or European) city could manage, it was over budget and time on an epic scale -- but did anyone really expect otherwise? Someone really screwed up on these bolts. They'll get fixed, the lawsuits will settle, and in the meant time this project will be the pride of Boston for many years to come.

    --
    The problem with quotes on the internet, is that nobody bothers to check their veracity. -- Abraham Lincoln