Two Big Tests For Personal Rapid Transportation
Al writes "A novel kind of transit system, in which cars are replaced by a network of automated electric vehicles, is about to get its first large-scale testing and deployment. Two of these Personal Rapid Transit (PRT) systems are being installed this year, one at Heathrow International Airport, near London, and one in the United Arab Emirates, where it will be the primary source of transportation in Masdar City, a development that will eventually accommodate 50,000 people and 1,500 businesses and is designed to emit no carbon dioxide. The article examines these two systems and includes video that includes an animation of the PRT system in action."
These pods look cute and all, but do they really do anything that trains and buses don't? The trains at SFO and SeaTac do a great job.
Engineering is the art of compromise.
I'm assuming the system is electric, but it could only meet the "no CO2" if the electric power is nuclear, hydro, solar, etc... If it's traditional electric power, it's just moving the source of the CO2 and perhaps the efficiency.
It seems as if something like this would attract vagrants, significant vandalism and just plain disgustingness. Would be pretty cool though if major cities were only filled with people like the scientists and engineers would designed it.
PRT's are not novel, they've been an engineering pipe dream for at least 60 years. There was a similar design effort in the 1970s in Paris that was the subject of an excellent book by Bruno Latour called Aramis. TFA says that PRT have been previous unworkable for "a variety of reasons, including the cost of the initial systems and the difficulty of integrating them into existing cities". The Paris project got all the way to physical prototypes, built sections of track, etc., and one of Latour's conclusions is that the PRT concept is itself unworkable. It lives in an inflexible no man's land between private vehicles and mass transit: passengers can't go where they want because the system has tracks and shared "pods", and engineers can't scale it how they want because the vehicles don't have flexible open space inside to cram in more passengers during busy times. Lose-lose, all around.
One big train or bus logically can only come by every so many minutes. You don't want to wait 15 minutes. Plus it can only follow a specific route.
For example, my office is 10 minutes away by car. Yet if I were to ride the bus that goes there it would take 1.5 HOURS because first I have to wait 15 minutes for it to show up, then I have to ride downtown to a central station, wait another 15 minutes for the bus going to where I want to go, and then ride that bus. All the way these buses are starting and stopping and go maybe overall 1/2 the speed of a car.
I don't have 1.5 hours of free time to spend commuting. Judging by the ridership, nobody else that is gainfully employed does either.
Now, if we had say smart electric taxis that would show up when I need my ride and go directly there at speed, it would be basically a no-brainer. I'd be on it in 5 seconds. Even if it DID go half as fast as a normal car, so what? I can live with 20 mins if it will save me money. I might even do it if it cost the same.
"Malo periculosam, libertatem quam quietam servitutem." -- Jefferson