Arizona Trialing System That Lets Utility System Control Home A/Cs

AzTechGuy writes "Arizona Public Service Co., Arizona's largest power company, is implementing a test program that would put customers' thermostats under their control to help balance power needs during critical peak usage times. APS will be able to remote control the customers' thermostats to control power draw from their A/C when there is a critical power transmission issue on the grid. Customers will be able to override these settings if they desire."

15 of 393 comments (clear)

  1. Since customers can override the system.... by Zanth_ · · Score: 3, Interesting

    It seems like a convenient method of limiting brown-outs. The privacy implications may be enormous for some but for others it will appear to be a good idea particularly since folks can override the system.

    1. Re:Since customers can override the system.... by deep_creek · · Score: 4, Interesting

      wonder what the surcharge charge/penalty fee is for overriding the setting?

    2. Re:Since customers can override the system.... by WalksOnDirt · · Score: 2, Interesting

      This isn't about AGW. It's about it being cheaper to make customers uncomfortably hot than to provide adequate power.

      --
      a,e,i,o,u and sometimes w and y (at be if of up cwm by)
    3. Re:Since customers can override the system.... by valdezjuan · · Score: 2, Interesting

      Just thinking about this briefly, I can think of at least one concern (though not directly related to privacy). Power companies (at least in the US) have shown that they are unable to secure their infrastructure. So allowing them to 'control' your settings *might* be allowing an attacker to do the same (or worse).

  2. Idaho has done this for years by Hirsto · · Score: 2, Interesting

    Idaho power opted for something far simpler several years ago. An exterior radio controlled override that cuts off the compressor motor (most of the load) for a maximum of 15 minutes while leaving your interior blower motor running. You don't notice a thing. If you happen to have two AC units they are alternated. This allows for much simpler peak load control of the power grid and doesn't torch off the customers.

  3. Power 101 by stox · · Score: 4, Interesting

    Roughly, the first 90% of the load cost is X, the next 9 to 10% cost is 10X. If you need to buy a remaining 1% on the spot market during a squeeze, the remaining 1% will cost 100X.

    Being able to shed that top 1% can make a big difference.

    --
    "To those who are overly cautious, everything is impossible. "
  4. Re:Maryland already has this by Xeno+man · · Score: 2, Interesting

    Yes you can override it. Seams like every moron believes that they are giving up control of their thermostat and that they just shut it off. What they do is raise the temperature by a few degrees so AC units are not working as hard and as much. It's a small reduction of power but multiply it by a few thousand homes and it's enough to shave off the peaks during high usage. And as far as I'm aware in Ontario, they have only send the signal a few times each year so it's not a daily thing.

    The credit on your bill is just a incentive to get the thermostat. The real saving is when you program you stat so your ac isn't cooling the house all day when your not around instead of having your old manual stat set to 15 deg C all day long.

  5. Re:Maryland already has this by plover · · Score: 5, Interesting

    While I can't quite tell if you're trolling or simply greedy, there's a certain logic behind your argument.

    Right now, electricity cannot be economically stored, so generation capacity has to equal peak demand, or else someone gets browned out. Utilities go to elaborate lengths to estimate future demand, based on housing construction, industrial zoning, winter temperatures, summer temperatures, etc. They build right to the edge of what their predicted demand will be, and rely on peak plants to supplant their generation capacity during those times when they've guessed wrong. But those peak plants charge 30X or more than the average generating rate, so there's strong incentive to not use them.

    What they're doing by all this penny pinching and building right to the edge of demand is they are thinning the tolerances. In the past, many things worked well or lasted long simply because they were massively overbuilt. For example, rather than fully study and understand the material strength of an aluminum engine block with steel cylinder sleeves, they cast the engine block out of iron. Rather than measure and predict the load to within 1% of future demand, they built a plant with double or triple the planned capacity. Those systems lasted a long time as a result, and people got very used to the high availability of their services.

    And in case you were serious, the correct economic answer is yes, they should offer you the extra capacity, as long as you're personally willing to pay the price. My electric company offers demand pricing. Normal pricing is $0.11/kWH for household use, regardless of what you're using the power for. But if you willing to let them control your air conditioner, you pay only $0.055/kWH for all the electricity your A/C consumes throughout the year, plus they discount your bill by $10/month for June, July and August. Control consists of a rolling 15-minutes-on/15-minutes-off duty cycle during peak demand. My heat pump was controlled for a total of 90 hours last summer, and the difference was hardly noticeable. When my heat pump was cut in the winter, the gas furnace kicked in as needed. I save several hundred dollars per year on this program.

    --
    John
  6. Re:Maryland already has this by michaelhood · · Score: 4, Interesting

    If you can override it, essentially all they're doing is informing you of power demand, not monitoring you without your consent or forcing you to do anything. Explain what oppressive totalitarian privacy-violating government regimes (i.e "Big Brother") have to do with any of this.

    Perhaps they should just send me an SMS then - "We'd like to turn off your A/C for the next 90 minutes. Our bid is a $5 credit. Accept?"

  7. Can bigger systems get advance notice? by Animats · · Score: 5, Interesting

    Residential systems usually don't have heat storage, but larger systems, with chilled water, often do. Some even make ice at night when power is cheap, to be melted during the day. It would be helpful to have a few hours advance notice of a hot period, so that the system could chill down an insulated water tank for use later.

    Power companies generally have a load curve planned a day ahead. That info is available; here's PJM's dashboard, which tells you far more than you ever wanted to know about the power grid for the northeastern United States. (Load right now: 55,292 megawatts. 1,896 megawatts of that is wind power. Spinning reserves are 2,274 MW. Current trouble report: "As of 09:30 hours, a Non-Market Post Contingency Local Load Relief Warning of 11 MW in the Rachel Hill area of FE (PN) has been issued for Transmission Contingency Control. Post Contingency Switching: Open Roxbury at Shadegap, Close Threesprings at Shadegap, open Curryville at Claysburg, open Snakespring at Bedford North." Tomorrow's estimated peak is around 71 gigawatts, expected at 17:30 hours.) The estimation system uses historical data and weather reports, plus bid info from really big users. So one can plan a day ahead if your HVAC system has heat storage.

    Routine control is exercised by financial means - all the players submit bids, which have a time range, a low output and price, a high output and price, and a ramp value. The control center crunches on these and decides who generates how much power. Large power buyers can bid, too; they have the option of saying how much they'll cut their load as the price rises. A big data center might choose to be a market player. When there are troubles, the control center can take "non-market actions", like the one above, but most of the time, the outstanding bids determine who does what.

    California went too far in deregulation, and had electricity auctions every half hour at one point. There were brokers and dealers who were pure speculators, and this affected live power operations in real time. That caused so much churn that there were blackouts. So now, bids are for a day ahead, and the matching of supply and demand is algorithmic. All this data is public, to keep the markets honest. That's why PJM offers such detailed data about their power grid.

    1. Re:Can bigger systems get advance notice? by Vegeta99 · · Score: 2, Interesting

      That's funny. The last emergency message given, that you quoted, is for the area I'm posting from. Considering the general lack of life and/or economic activity in the area, I would like to know where the hell 11 megawatts is ending up.

    2. Re:Can bigger systems get advance notice? by Animats · · Score: 3, Interesting

      That message just means that, due to some problem, the power grid as currently configured was one failure away from having to drop 11MW of load. This occurs when a line in the transmission system is out of service, and the remaining lines are carrying the load, but there's no redundancy. So orders are issued to close certain switches and open others, or to start up additional generators, so that the system is reconfigured to again allow for any single failure. PJM's control center is announcing, as a warning, who potentially gets dumped if they lose another resource. The area mentioned is not necessarily the cause of the problem. Actual load dumps are very rare; I think the last one in the PJM control areas was in 1997.

      For Slashdot readers, it's like bringing a replacement disk on line when a RAID disk system loses a disk. The RAID system is still working, but there's now a single point of failure until a new drive is switched in.

  8. Re:Maryland already has this by cyn1c77 · · Score: 3, Interesting

    They got this on my hot water....and I can't opt out or over ride. They report only using it for about an hour at a time, and only 2 or 3 days a year for the last few years though. Yes, peak demand during summer afternoons.

    Phil

    Just out of curiosity, how does that work? You can't override a system that sits in your house?

    What do you get out of this deal? Can you just not pay your bill during your peak expense season? Quid pro quo, you know?

  9. Re:Don't cry monopoly. by QuantumRiff · · Score: 2, Interesting

    Most states, in addition to rebates and grants ( and federal ones) will give you extremely low interest loans.

    So that 30k system ends up costing you about $15k over 7-10 years, or $150 - $200 a month. Then, you have basically no more utility bill, ever. (and still have 18 years of warranty on your solar panels...)

    --

    What are we going to do tonight Brain?
  10. Re:Don't cry monopoly. by raygundan · · Score: 2, Interesting

    After all the tax credits and such, our 7kW system was about $8k in Arizona. It makes about $1300/year in power at present electric rates, and has a 25-year warranty. If you can afford it, it's beats the living crap out of putting your money in a CD, even assuming we could get something more like historical CD rates these days.