Google PAC-MAN Cost 4.8M Person-Hours
The folks at Rescue-Time, who make software that helps you (and companies) figure out how you spend your online time, did a modest calculation based on their user base and concluded that Google's playable PAC-MAN doodle cost the world over 4.8 million person-hours of productivity last Friday. "Google PAC-MAN consumed 4,819,352 hours of time (beyond the 33.6M daily man hours of attention that Google Search gets in a given day). $120,483,800 is the dollar tally, if the average Google user has a cost of $25/hr. (note that cost is 1.3 – 2.0 X pay rate). For that same cost, you could hire all 19,835 Google employees, from Larry and Sergey down to their janitors, and get six weeks of their time."
Also, Google made the doodle permanent.
Still pales in comparison to the average Slashdot Idle story...
"This post contains words, known to the State of California to cause thought. Wash brain thoroughly after reading."
People spent 4.8 million hours enjoying life rather than slaving away for the man :P
No sig for you!!
start the game on the penultimate level, level 255 - so yo can experience your own kill screen
There's all sorts of incorrect presumptions by the original article author, like all the time spent playing Google pac-man was necessarily at work. Like nobody is playing it in their own time.
Another one is that people would do work if it wasn't for pac-man. Hell I'd just find a different distraction to avoid work if the pac-man game wasn't around.
Unfortunately, the hyper inflated concept of the unflinching, tireless, resolute worker is best left as a relic of the industrial revolution. Never in the course of human history, outside of the industrial revolution, has a human being been expected to produce "something" for 8 straight hours a day, 5 days a week (and for some more than that). Such simple minded focus strips the mind of creativity; creativity which has dramatically advanced and improved the human condition.
I am a hard core capitalist and stalwart industrialist, but I am also a pragmatist. Non stop, widget production, should be left to the factory worker who needs to follow a standard script. Expecting an IT professional, a researcher, or an engineer to simply keep producing something measurable with each minute of the day shows a complete lack of understanding of your resources. I forget what the name of the study was, but it took three sports teams and show the level of performance improvements over a team that 1) vacationed for a week, thinking about the upcoming game, 2) team that unceasingly trained for the upcoming game, 3) team that sporadically trained for the upcoming game. turns out the vacationing team that spent some time visualizing the upcoming game, produced the greatest results, with the team that trained too hard had the smallest improvements.
Long story short, expecting factory worker performance from skilled workers, is as foolish as expecting a successful heart transplant surgery from a line backer.
20th century Marxism is not progress...
Can I just say that I *love* firefighting work, cause it's the last bastion of objective capability over affirmative action?
That unconscious guy in the burning building doesn't *care* that you're female, and can only drag 150 pounds; he still weighs 200.
And amazingly enough: the exams recognize this.