TEPCO Unveils Plan To Deal With Fukushima Crisis
RedEaredSlider writes "Tokyo Electric Power Co. unveiled its plan for dealing with the crisis at the Fukushima Daiichi nuclear power plant, the worst nuclear disaster since Chernobyl. TEPCO said the radiation levels should drop over the next three months. It will take about six months for the reactors to achieve 'cold shutdown' in which the temperature of the water inside the reactor is less than 100 degrees Celsius (212 F). The current plan for cooling the reactors will mean injecting nitrogen into the reactor pressure vessel. All four damaged reactors experienced hydrogen explosions when water, heated by nuclear fuel, turned to steam and reacted with the zirconium alloy cladding of the fuel rods. Hydrogen, when exposed to oxygen, combusts. Nitrogen is an inert gas, so TEPCO hopes that it will prevent further explosions."
I wonder WTF their contingency plan is if a big tsunami hits now ...
I strongly believe we know how to set up technical systems for safe nuclear power. However I'm extremely sceptical of the idea that we know how to set up social / administrative systems for safe nuclear power. It's too easy to hide systemic weakness behind secrecy, or too embarrassing to identify and fix present failings, or the debate gets too polarised and ideological so people, politicians and regulatory systems lose sight of the actual safety issues because of the headline effect etc.
I wouldn't be quick to blame money or corruption or unscrupulous people, either. The key problem is secrecy -- even without malice, familiarity makes you blind to system flaws -- we software people know this very well. Only total transparency can ensure that flaws do not get hidden. On the other hand I don't know how this can be reconciled with security against sabotage.
There's a need for a sober, measured debate about all this and it's a pity that a few fundamentalists (on both sides) are making this impossible.
perl -e 'fork||print for split//,"hahahaha"'
You would hope. But given that they don't seem to have been prepared for foreseen circumstances*, I'm not betting on their team until I see management make some trades.
* - the 10-meter tsunami was the unforeseen circumstance. Everything after it was foreseeable, and there were design choices that guaranteed a destructive cascade once the power went out. Allowing the buildings to explode and damage the systems used to keep the buildings from exploding more is a pretty major fuckup in the realm of reliability engineering. The use of zinc cladding, the lack of effective venting for the hydrogen, the proximity of the explosion to components that could be damaged in a hydrogen explosion, blockage of access by debris from the explosion... Someone 40 years ago said that having backup generators would prevent these things from happening, and didn't consider what if the generators simply broke and couldn't be replaced. Even though they may have known what could be done.
Oh, and there's the part about how they did get generators rushed to the site, but the electrical connections didn't match up so they couldn't use them. I'm still not sure that's been reported right, because what the fuck?
Normally, cold shutdown takes a few days. At Three Mile Island, it took two weeks. Six months is worrisome. Too many more things can go wrong during that period.
They still have so little information about what's going on inside the reactors. Check the latest JAIF status report. Pressure is unknown. Temperature is unknown. Water level is unknown. "Fuel rods exposed partially or fully". Reactors 1 and 3 are buried under piles of rubble. And they have to fix the plumbing under that debris.
Sigh.
N2 is inert, unless they're planning on planting peanuts in the reactor room...
...the problem with this entire situation is that Japan let commercial companies run their entire nuclear infrastructure. I'm not sure about you folks, but all commercial companies do exactly what is required within the letter of the law, but not an ounce more if it would cost more money. Sure, it's a 40 year old facility, sure it was built within the specs for the time. But it was still operational in 2011.
Question is, would a public-run utility design and build nuclear infrastructure to within the letter of the law or would they 'overbuild' for safety? Is this entire situation the cause of capitalism running into its core fault - its lack of concern for the expensive 'doing the right thing' vs the cheaper 'doing things right.'? I don't really know, but it smacks of the reality of letting a company totally focused on making and saving money vs making decisions to protect the people of Japan.
Management is doing things right; leadership is doing the right things. - Peter F. Drucker
Liquid nitrogen is less effective than water at extracting heat. I ran through the calcs a few weeks ago:
http://news.slashdot.org/comments.pl?sid=2039038&cid=35501128
I'm saying they don't really have to do anything else, and basically aren't, besides keeping stasis until the thing cools off.
Uh no. They can't just keep doing what they're doing and wait. It's more urgent than that. With the rupture in unit 2 (believed to be in the suppression tank), that water they have to keep pumping in keeps coming out bringing highly radioactive particles from the damaged fuels rods along. They pumped over 100 tons of it out of one tunnel only to have it fill back up within two days. They may have briefly interrupted what's getting into the ocean, but it is piling up and needs to be dealt with soon.
They're injecting nitrogen into unit 1 hoping to reduce the chance of a hydrogen explosion, but the pressure not rising indicates a leak. They've said it may be venting contaminated gases. (but don't be too surprised if it turns out they are unintentionally pushing more contaminated water out somewhere)
For some pretty good articles check out what the media over there are saying.
Here's a six part series on how Tepco and the government have complicated matters.
It has many details no covered by most U.S. media.
http://www.yomiuri.co.jp/dy/national/T110416002672.htm
http://www.yomiuri.co.jp/dy/national/T110415004983.htm
http://www.yomiuri.co.jp/dy/national/T110414006040.htm
http://www.yomiuri.co.jp/dy/national/T110413004031.htm
http://www.yomiuri.co.jp/dy/national/T110412006319.htm
http://www.yomiuri.co.jp/dy/national/T110411004567.htm
It's no noble gas; but N2 is pretty mild mannered. Nitrogen fixation generally requires either really clever enzymes(as with nitrogen fixing bacteria) or fairly abusive temperature and pressure along with a catalyst(as with the Haber Process). It is commonly used as a shield gas for welding of many of the less zesty metals; because it is probably the best-placed material on the cost/inertness curve. Nitrogen, liquid or compressed gas, is dirt cheap compared to any genuinely inert gas, and is inert enough for quite a few applications.
Compounds with a high proportion of nitrogen atoms, on the other hand, are to be considered guilty until someone who loves their fingers less than you do has finished proving them innocent...
So you don't think the metal pressure vessels, piping and fittings corrode and degrade under conditions of very high temperature, pressure, and nuclear radiation? They will never be as safe as the day they were built because it's not practical to inspect constantly and thoroughly enough to catch every single flaw before it becomes the least bit dangerous. The difference is if a coal, oil, or gas plant blows a pipe, a bunch of non-radioactive steam escapes, maybe kills some personnel on site, and maybe causes some fairly expensive damage. In a nuclear plant, there is always that possibility that a failure may progress to the catastrophic complete devastation of the entire site and some of the surrounding area.
as former construction scheduler at nuke plant, I disagree. We have containment buildings with "bandages" in them, where the concrete was cut to allow steam generator to be removed and replaced. Reactor heads have been found with enough nozzle penetration wear and leaking they will soon need replaced (at something like $150M a pop). Primary coolant pumps are being replaced as end of life. In other words, somewhat over 40 years is about what you get without major rebuilding being needed, they are indeed clunkers needing major expensive maintenance.