Ask Slashdot: What Would You Include In a New Building?

First time accepted submitter weiserfireman writes "For the first time in our company's 60 year history, we are going to be building a new facility from scratch. We are a CNC Machine shop with 40 employees and 20 CNC machines, crammed into a 12,000 sq foot building. We are going to build a new 30,000 sq foot building. I am the only IT person. I support all the computer systems, as well as all the fire/security/phone systems. My Boss has asked for my input on what infrastructure to include in the new building to support current and future technology. 1st on my list is a telecommunications equipment room. Our current building doesn't have one. I have been researching this topic on the Internet, and I have a list of a lot of different things, all of them are nice, but I know I am going to have a limited budget. If you were in my shoes, what priorities what features would you design into the building?"

6 of 422 comments (clear)

  1. Conduit by toygeek · · Score: 5, Insightful

    Perhaps this is obvious, but its the very first thing that popped into my head. You might not need to install a lot of cabling to run what you have, relatively speaking, but you WILL need to install more later and you WILL wish you had installed bigger conduit. So, plan your current needs as being 1/3 to 1/2 capacity and leave plenty of room for more. It doesn't cost much more to install bigger/more conduit now, but it will cost TONS more to install it later. Your successors will praise you.

    1. Re:Conduit by zentigger · · Score: 5, Insightful

      and make sure you leave an extra pull string inside each run!

      --

      the above is my personal opinion and does not necessarily reflect that of the little voices in my head

  2. Re:Enough copper in the walls... by Anonymous Coward · · Score: 5, Insightful

    Run away from "The Wireless Future" as fast as you can. Pull cable to everything that isn't moving and has an ethernet port

  3. Closets by hymie! · · Score: 5, Insightful

    Somebody's going to mod me down, but I'm dead serious. This is the second time a company I worked for has moved to a new location with no storage space for anything at all -- HR documents, financial documents, machinery (both active and surplus), office supplies, even employee's coats. Let me assure you how professional it looks to have random file cabinets placed all over what are supposed to be ADA-compliant-width hallways. </sarc>

  4. Re:Cooling by silas_moeckel · · Score: 5, Insightful

    Please for the love of do not have it be part of the building AC especially in a machine shop. You have solvents, grease, lubricant, metal bits etc in that shop air. Building AC is not designed to run in winter (assuming you don't live where AC is required year round). The split systems are an easy install and only run a few k at the low end. Do make sure there is nothing going through the roof or carrying liquids above the room. Do try and get it on an exterior wall and have backup fans installed though the wall a couple hundred bucks of fan can cool the room well enough when the AC is broken. Depending on the type of machines you expect long term fiber is always a good thing immune to EMI from plasma cutters and the like. Good door locks that log per person to the security system is a good idea same with camera's.

    --
    No sir I dont like it.
  5. Re:Suggestions by burnt_cajun_toast · · Score: 5, Insightful

    Since you're the only (IT) person, it might be a very good idea allocate budget $ and hire a firm that has the experience designing facilities. Aside from the fact you might miss a very important feature, you really should have the input from professionals that have experience along with the electrical/fire/security since it does not seem to be your expertise. The money spent at the design phase just might save you that much more down the line, especially since a small error could have major consequences. Just my $.02