NASA Approves Production of Most Powerful Rocket Ever

As reported by the Sydney Morning Herald, NASA has given a green light to the production of a new motor, dubbed the Space Launch System, intended to enable deep space exploration. Boeing, prime contractor on the rocket, announced on Wednesday that it had completed a critical design review and finalized a $US2.8-billion contract with NASA. The last time the space agency made such an assessment of a deep-space rocket was the mighty Saturn V, which took astronauts to the moon. ... Space Launch System's design called for the integration of existing hardware, spurring criticism that it's a "Frankenstein rocket," with much of it assembled from already developed technology. For instance, its two rocket boosters are advanced versions of the Space Shuttle boosters, and a cryogenic propulsion stage is based on the motor of a rocket often used by the Air Force. The Space Frontier Foundation, an advocacy group and frequent NASA critic, said Space Launch System was "built from rotting remnants of left over congressional pork. And its budgetary footprints will stamp out all the missions it is supposed to carry, kill our astronaut program and destroy science and technology projects throughout NASA."

14 of 146 comments (clear)

  1. I dont see a problem here by ganjadude · · Score: 5, Interesting

    . Space Launch System's design called for the integration of existing hardware, spurring criticism that it's a "Frankenstein rocket," with much of it assembled from already developed technology.

    I would much rather them use existing tried tech and incrementally advance them rather than try a radical new design. A new design would take extra years of testing before it is ready for use but if we can tweak existing tech, and make it useful for deep space why not??

    Based on the next sentence it tells me that they are more concerned with bringing home the bacon than making progress in space.

    --
    have you seen my sig? there are many others like it but none that are the same
    1. Re:I dont see a problem here by Trepidity · · Score: 4, Insightful

      Yeah I don't see how "propulsion stage is based on the motor of a rocket often used by the Air Force" is a negative thing about it. If anything that suggests they might actually be able to deliver something that works.

    2. Re:I dont see a problem here by Anonymous Coward · · Score: 4, Insightful

      The problem is that this rocket was designed by the senate so the money would be spent in as many states as possibles. US senators are usually lawyers, not engineers, there's no way they have the technical knowledge to design a good rocket.

    3. Re:I dont see a problem here by wbr1 · · Score: 3, Insightful

      In my opinion the problem is not reuse of existing tech. It allows reuse of manufacturing capability, it comes with well known maintenance and troubleshooting procedures, etc. The problem is handing the gov a huge bill for doing very little, and using existing tech to milk out a big payday, and not choosing the tech based on suitability, or using it to advance the science any. The latter is something Boeing has been very good at.

      --
      Silence is a state of mime.
    4. Re: i dont see a problem here by bbn · · Score: 3, Interesting

      SpaceX already has Falcon 9 Heavy which will do most of what NASA wants to do with SLS. In addition SpaceX is developing the Mars Colonial Transporter http://en.wikipedia.org/wiki/M... which will put 100 tons of cargo on Mars. In comparison the SLS will only put 100 tons in low earth orbit.

      Oh and the Mars Colonial Transporter will be reusable.

    5. Re:I dont see a problem here by Charliemopps · · Score: 5, Insightful

      . Space Launch System's design called for the integration of existing hardware, spurring criticism that it's a "Frankenstein rocket," with much of it assembled from already developed technology.

      I would much rather them use existing tried tech and incrementally advance them rather than try a radical new design. A new design would take extra years of testing before it is ready for use but if we can tweak existing tech, and make it useful for deep space why not??

        Based on the next sentence it tells me that they are more concerned with bringing home the bacon than making progress in space.

      It's the standard problem when you're a tech. The client likes to give you a solution and ask you to build it, rather than give you a problem and ask you to solve it.

      If their goal is to save money, then state that in the requirements. If you want it to work with existing tech, then state that. By instead putting what you think the solution is directly into the requirements you're not only limiting your techs ability to solve the problem, you're also hiding your true goals from them. That tech probably has far better solutions for that problem than you could possibly think of so let them work on it.

      Better requirements would be:
      We want to go to mars for less than $20 billion.

      Short, simple, Let the technical experts run with that.

    6. Re:I dont see a problem here by cheesybagel · · Score: 5, Interesting

      This summary is a load of bull. As is the article. Production of a new motor my ass. The SLS is supposed to use 4 RS-25 Space Shuttle Main Engines in the center core, of which there are 15 and parts of another in stock, and two 5 segment Solid Rocket Boosters similar to those of the Space Shuttle. The second stage is based on a Delta IV EELV second stage using the RL-10. What is 'new' here in terms of propulsion? They are adding another segment to the SRBs. Whoopie do.

      Get this: SLS is predicted to cost as much as the Space Shuttle did per year, but it will launch once every 2-3 years instead of 4 times a year like the Space Shuttle. If you do the math they have RS-25 engines for 3-4 flights. SLS is expendable remember? The production assembly line for RS-25 has been closed years ago. So if they want to fly more than 3-4 flights with it they will probably have to design a new engine which will take like 5 years to do. At best. The whole thing is sheer nonsense.

    7. Re: i dont see a problem here by FatLittleMonkey · · Score: 5, Informative

      Falcon 9 has a payload capicity of 13,150 Kg to LEO.

      He said "Falcon 9 Heavy" (the original name of the Falcon Heavy). So 50,000kg to LEO, should fly in the next year or two, and cost less than $100m per launch (say $150m with a "NASA paperwork tax".)

      SLS is to have a payload capacity of 130,000 Kg to LEO.

      SLS Block "zero" will lift around 60,000kg, and may fly in 2017 or 2018. Development will have cost $10-12 billion from now 'til then. It won't be able to lift Orion (which won't be ready anyway).

      Block I is meant to loft 70,000 kg to LEO, flying in 2021 at the earliest. Development will have cost $21 billion from now 'til then. It will be able to lift Orion, but only for 14 day missions around the moon and back.

      Block IA is meant to lift 105,000kg, some time in the mid-2020's. And Block II, the one you are talking about, with 130,000kg to LEO, by 2032. Development will have cost over $50 billion from now 'til then.

      That doesn't include any other hardware, nor any launch or mission costs. Just development.

      --
      Science is all about firing a drunk pig out of a cannon just to see what happens.
  2. Saw the last launch of the Saturn V by PoconoPCDoctor · · Score: 3, Interesting

    From 10 miles away in Titusville, Fl. I will always remember the pounding of my chest form the rockets. Let's go to Mars.

    --
    "Let us raise a standard to which the wise and honest can repair" - George Washington
  3. Is it really expensive? by ArcadeMan · · Score: 4, Insightful

    If I compare that amount to all the money wasted so far on useless "wars" by the U.S.A., it's not much.

  4. The rocket to nowhere by schwit1 · · Score: 3, Interesting

    The high cost and slow development of SLS will increasingly make it a loser in its political battle with the new commercial companies. Eventually legislators will recognize its impractically and unaffordability -- especially if the commercial companies continue to meet their milestones and achieve success, as they have been doing. When that happens, the influence of individual senators like Shelby to shovel pork to their particular states or districts will be outweighed by the overall political benefits for everyone in Congress to get American astronauts into space quickly and cheaply on an American-built spaceship.

    1. Re: The rocket to nowhere by 0123456 · · Score: 3, Informative

      Yeah. SpaceX built a new rocket engine and two new rockets, and actually launched them into space, for about the same amount of money as NASA spent putting a dummy upper stage on top of a shuttle SRB and launching it into the ocean.

      Go NASA R&D!

      SLS is a pure pork project, there are no funded missions that need it, and it will cost billions of dollars to launch, which means there will be few, if any, missions that ever do use it. There is no rational justification for it whatsoever.

      At the rate they're going, when NASA launches a crew to Mars in an Orion capsule on an SLS booster, there'll already be tourists waiting to greet them, having been flown there by SpaceX for a tiny fraction of the cost of the government option.

  5. Re:I wish them well by FatLittleMonkey · · Score: 4, Interesting

    I don't understand the criticism regarding ...

    Basically, they are repeated all the old mistakes of Shuttle and ISS. Single unaffordable top-down designs, expensive sole-source cost-plus contracts, convoluted designs more intended to feed the contractor networks in Congressional districts than to deliver improved hardware, flubbery half-hearted missions that mutate to fit the rapidly contracting hardware abilities rather than hardware designed for missions. And because everything is so expensive and poorly planned, development has to be smeared out over decades, giving time for endless Congressional budget games with the attendant schedule and cost blow-outs, and design compromises piled on top of design compromises just to get something launched.

    Paraphrasing Gen. Augustine, in the analysis over Constellation (SLS's precursor), "If someone handed it to NASA, already build and paid for, NASA still couldn't afford to operate it."

    --
    Science is all about firing a drunk pig out of a cannon just to see what happens.
  6. Re:Amen man by germansausage · · Score: 4, Insightful

    Nasa 2014 - about $18 billion
    Iraq + Afghanistan - $4 to $6 trillion
     
    So about 200 to 300 times more for the war than what NASA gets this year.