Nuclear Plant Taken Down In Anticipation of Snowstorm
mdsolar writes Pilgrim Power Plant in Plymouth was taken offline in anticipation of the weekend snowstorm. According to a statement from Entergy, the owner of Pilgrim, the plant was taken off line in preparation of "a potential loss of offsite power or the grid's inability to accept the power Pilgrim generates." This is the second time this season the plant has been shut down due to storm conditions. On January 27 the facility was taken offline after the two main power transmission lines were knocked out by blizzard conditions. Although the transmission lines were restored within a few days, the plant remained offline until February 7 at which time it was reconnected to the grid.
An emergency measure when done after the fact.
He probably wouldn't post something about a 'renewable' going offline, based on his posting history.
https://en.wikipedia.org/wiki/...
Right...
However, in this case, the customers don't lose power because the generation isn't there. Customers would lose power because the grid fails. Entergy has power from other sources or purchasing agreements to make up for this temporarily.
Similarly, it is unsafe (and illegal, technically) to run your nuclear powerplant with no access to the grid. If you have a coal plant that gets disconnected from the grid, you'd shut it down too with no way to generate revenue from burning additional fuel.
Devil's advocate to your misguided devil's advocate...The problem is the electrical grid not the source.
Sounds like this is a "preventative measure".
Normally there is some time between neutron capture and actual nuclear fission (I have heard a figure of 15 minutes). This means that even if the control rods are slammed in when the power transmission lines were cut the previous heat load would still be generated for a period of time. Often this means resorting to drastic measures to reduce the neutron flux to zero ASAP (certain salts are added to cooling loops which achieve this but requires a good flush to get rid of).
Controlled shutdown means the reactor can be restarted in "a couple of hours"
Emergency shutdown means the reactor can be restarted in "a couple of weeks"
Burnt once, twice shy...
...that it didn't melt down. We get it, MD, you don't like nuclear power.
Alcohol, Tobacco and Firearms should be the name of a store, not a government agency.
Nuclear plants of the design mentioned in the article must legally have offsite power to continue operation. As soon as offsite power is lost, the plant is required to shutdown. An emergency shutdown is more paperwork than a planned shutdown such as this.
The reason for this is that in an accident scenario, you would like to rely on offsite power to run your emergency coolant pumps for this particular design.
Newer reactor designs don't have this issue, but this is a pretty economic decision considering an emergency shutdown if/when the offsite power does eventually trip. The grid seems pretty unreliable based on past experience, as the article even notes.
I've seen a wide variety of broken components in even well run thermal power plants (I've never worked with nukes but anything after the water is heated is pretty similar). I've seen even more on the way to breaking and getting cut out before they can fail.
So to sum up I don't think there's much to take away from a single outage - if all you've got is outage times you'd have to get statistical with more info before a sensible judgement.
A month and a serious death toll, that does indeed suck. I'd wonder why they didn't truck in a pile of the container sized generators or a similar disaster plan as done by utilities after hurricanes.