Slashdot Mirror


Daimler Builds Massive Industrial Energy Storage Systems From Used EV Batteries (computerworld.com)

Lucas123 writes: German carmaker Daimler AG is building large battery storage systems for industrial use from the used lithium-ion batteries of its all-electric and hybrid vehicles. The first of Daimler's "2nd use battery storage units" will consist of 1,000 smart electric drive vehicle batteries and have a 13MWh of capacity. It is expected to be connected to the electrical grid in Lünen, Germany early next year. All of Daimler's battery storage units are currently planned to be greater than a megawatt in capacity, meaning they'll only be for commercial, not residential use, but the company said it does expect those batteries to be cost competitive with the ones Tesla announced earlier this year.

1 of 73 comments (clear)

  1. Re:This is great by Ralph+Wiggam · · Score: 3, Interesting

    A similar idea is to use electric vehicles in people's garages to "time shift" demand. Nevada Power (and I'm sure others) offers a rate plan for EV owners where power is much cheaper after 11pm and more expensive in the afternoons. Cars can already be set to start to wait until a set time to begin charging.

    Power companies spend a lot of money building "peaker" power plants that are only needed between 4pm and 7pm. Theoretically, when a power company hits its supply limit, it could put a call out to any EV currently plugged in saying "I'll pay 6 cents per kWh for what's in your battery". If they don't get as much power as they need, they would put out another request at 7 cents. If you paid 4 cents the previous night, that's a good deal for everyone. The car would be set up with rules about what price you want and how much power you're willing to part with.